An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem

被引:15
|
作者
Hu, Wenbin [1 ]
Wang, Huan [1 ]
Peng, Chao [1 ]
Wang, Huang [1 ]
Liang, Huangle [1 ]
Du, Bo [1 ]
机构
[1] Wuhan Univ, Sch Comp, Wuhan 430072, Hubei, Peoples R China
关键词
Cellular automata; Fuzzy cell; Uncertainty; Multi-project scheduling; Outer-inner; PARALLEL GAUSSIAN-ELIMINATION; FROG-LEAPING ALGORITHM; GENETIC ALGORITHM; OPTIMIZATION; POLICIES; AUCTION; RCPSP;
D O I
10.1007/s00500-014-1395-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Current research on the resource-constrained multi-project scheduling problem(RCMPSP) mainly focuses on the constrained resources or other single uncertainty factor that cannot satisfy the practical need of enterprise management. This paper addresses the dynamic uncertain multi-project scheduling problem (DUMPSP), which alleviates the above problem of RCMPSP by synthesizing the analysis of uncertainty, sensitivity, and lean management of resources and durations. An outer-inner uncertainty fuzzy cellular automata algorithm (OIUFCA) is proposed to solve DUMPSP. The problem is divided into several parts: (1) fuzzy cell is employed to describe the project cell and process cell in DUMPSP; (2) a fuzzy outer cellular automata (FOCA) model is defined to solve the project scheduling of DUMPSP, and a fuzzy inner cellular automata (FICA) model is constructed to solve the process scheduling; (3) multi-level feedback strategy (MFS) is further proposed to deal with the multi-level dual-stage optimization problem of DUMPSP. Besides, FOCA and FICA model execute co-evolution under the control of MFS. Extensive experiments are carried out to evaluate the performances of OIUFCA with other state-of-the-art algorithms. It is revealed that OIUFCA achieves a better performance in success rate and convergence speed in solving DUMPSP, and OIUFCA has a good solution under different conditions of uncertainty, sensibility, and lean management.
引用
下载
收藏
页码:2111 / 2132
页数:22
相关论文
共 50 条
  • [21] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [22] Multi-project decentralized scheduling problem solving by market mechanism
    Wang, Lei
    Zhan, De-Chen
    Nie, Lan-Shun
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2014, 20 (08): : 1969 - 1979
  • [23] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [24] New summary measures and datasets for the multi-project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 299 (03) : 853 - 868
  • [25] An Improved Artificial Immune Network Algorithm to Solve Multi-project Scheduling Problem in Product Development
    Chen, Ting-gui
    APPLIED MECHANICS AND MECHANICAL ENGINEERING, PTS 1-3, 2010, 29-32 : 923 - 928
  • [26] Modeling and algorithm for resource-constrained multi-project scheduling problem based on detection and rework
    Zhu, Hongwei
    Lu, Zhiqiang
    Lu, Chenyao
    Ren, Yifei
    ASSEMBLY AUTOMATION, 2021, 41 (02) : 174 - 186
  • [27] A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework
    Zhu, Hongwei
    Lu, Zhiqiang
    Hu, Xinming
    2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 1058 - 1063
  • [28] Multi-project Scheduling Problem with Human Resources Based on Dynamic Programming and Staff Time Coefficient
    Chen Jun-jie
    Zhu Jiang-li
    Zhang Ding-ning
    2014 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (ICMSE), 2014, : 1012 - 1018
  • [29] Integrated decision making model and algorithm of project splitting and multi-project scheduling
    Yang C.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2018, 24 (03): : 550 - 557
  • [30] Multi-Project Optimization with Multi-Functional Resources by a Genetic Scheduling Algorithm
    Dulai, Tibor
    Dosa, Gyorgy
    Werner-Stark, Agnes
    ACTA POLYTECHNICA HUNGARICA, 2018, 15 (04) : 101 - 119