共 13 条
- [1] Mastor A.A., An experimental investigation and comparative evaluation of production line balancing techniques, Management Science, 16, 11, pp. 728-746, (1970)
- [2] Browning T.R., Yassine A.A., Resource-constrained multi-project scheduling: priority rule performance revisited, International Journal of Production Economics, 126, 2, pp. 212-228, (2010)
- [3] Blazewicz J., Lenstra J.K., Rinnooy K.A.H.G., Scheduling subject to resource constraints: classification and complexity, Discrete Applied Mathematics, 5, 1, pp. 11-24, (1983)
- [4] Kim K.W., Yun Y.S., Yoon J.M., Gen M., Yamazaki G., Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling, Computers in Industry, 56, 2, pp. 143-160, (2005)
- [5] He H., He Z., Liu R., Scheduling optimization of multi-project overdue penalty minimization based on resource sharing, Industrial Engineering and Management, 20, 6, pp. 69-75, (2015)
- [6] Gao J., Guo S., Du B., An ant colony algorithm for resource-constrained multi-project zcheduling problem, Journal of Wuhan University of Technology: Transportation Science & Engineering, 37, 1, pp. 183-186, (2013)
- [7] Wang W., Wang X., Ge X., Multi-objective optimization model for multi-project scheduling on critical chain, Advances in Engineering Software, 68, 1, pp. 33-39, (2014)
- [8] Wang W., Wang X., Ge X., Multi-mode and multi-project scheduling modeling and algorithm with activity splitting, Computer Integrated Manufacturing Systems, 20, 6, pp. 1388-1397, (2014)
- [9] Asta S., Karapetyan D., Kheiri A., Combining Mon- te-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem, Information Sciences, 373, pp. 476-498, (2016)
- [10] Kruger D., Scholl A., A heuristic solution framework for the resource constrained(multi-)project scheduling problem with sequence-dependent transfer times, European Journal of Operational Research, 197, 2, pp. 492-508, (2009)