共 50 条
- [1] Optimization of Multi-project in Limited Resources on the Basis of Improved Genetic Algorithm [J]. PACIIA: 2008 PACIFIC-ASIA WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION, VOLS 1-3, PROCEEDINGS, 2008, : 913 - 916
- [2] Multi-project scheduling using an heuristic and a genetic algorithm [J]. The International Journal of Advanced Manufacturing Technology, 2006, 31 : 360 - 366
- [3] Multi-project scheduling using an heuristic and a genetic algorithm [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366
- [5] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
- [6] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
- [8] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
- [9] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082
- [10] Research on a Multi-project Scheduling Optimization Algorithm with Resource Time-Windows [J]. 2017 2ND INTERNATIONAL CONFERENCE ON COMPUTATIONAL MODELING, SIMULATION AND APPLIED MATHEMATICS (CMSAM), 2017, : 425 - 431