Multi-Project Optimization with Multi-Functional Resources by a Genetic Scheduling Algorithm

被引:4
|
作者
Dulai, Tibor [1 ]
Dosa, Gyorgy [1 ]
Werner-Stark, Agnes [1 ]
机构
[1] Univ Pannonia, Egyet U 10, H-8200 Veszprem, Hungary
关键词
multi-project scheduling; genetic algorithm; multi-purpose machines; MANAGEMENT;
D O I
10.12700/APH.15.4.2018.4.6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we show how a genetic scheduler algorithm can be applied to solve a hard multi-project optimization problem with shared resources. The resources work in multiple operation modes, so they can substitute each other (but with different efficiency). We consider processes which have quite complex structure, i.e., it allows the existence of parallel sub-processes. This problem is extremely complex, there is no chance to get the optimal solution in reasonable time. The proposed algorithm intends to find a near-optimal solution, where the goal of the optimization is the minimization of the makespan of the schedule. We present the genetic operations of the algorithm in detail. We fill the pool of populations only with feasible solutions, but making possible the discovery of the whole search space. The feasibility of a schedule is ensured by excluding time-loops regarding the sequence of the tasks both in their process and in the queue of their resource. We executed several tests for determining the (hopefully) optimal parameters of the algorithm regarding the number of generations, the population size, the crossover rate and rate of the mutation. We applied the algorithm for many problem classes where the parameters of the input are fixed or randomly chosen from some interval.
引用
收藏
页码:101 / 119
页数:19
相关论文
共 50 条
  • [1] Optimization of Multi-project in Limited Resources on the Basis of Improved Genetic Algorithm
    Guo, Rong
    Guo, Weiwei
    Wang, Wei
    [J]. PACIIA: 2008 PACIFIC-ASIA WORKSHOP ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION, VOLS 1-3, PROCEEDINGS, 2008, : 913 - 916
  • [2] Multi-project scheduling using an heuristic and a genetic algorithm
    S. Kumanan
    G. Jegan Jose
    K. Raja
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 31 : 360 - 366
  • [3] Multi-project scheduling using an heuristic and a genetic algorithm
    Kumanan, S.
    Jose, G. Jegan
    Raja, K.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 31 (3-4): : 360 - 366
  • [4] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [5] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [6] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
    Chen, James C.
    Jaong, Wun-Hao
    Sun, Cheng-Ju
    Lee, Hung-Yu
    Wu, Jenn-Sheng
    Ku, Chung-Chao
    [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
  • [7] AN EFFICIENT GENETIC ALGORITHM FOR DECENTRALIZED MULTI-PROJECT SCHEDULING WITH RESOURCE TRANSFERS
    Zhang, Jingwen
    Liu, Wanjun
    Liu, Wanlin
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 1 - 24
  • [8] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem
    Li, Jinghua
    Liu, Wenjian
    [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
  • [9] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem
    Liu, Wenjian
    Li, Jinghua
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082
  • [10] Research on a Multi-project Scheduling Optimization Algorithm with Resource Time-Windows
    Li, Song-lin
    Dong, Xing-ye
    Han, Sheng
    [J]. 2017 2ND INTERNATIONAL CONFERENCE ON COMPUTATIONAL MODELING, SIMULATION AND APPLIED MATHEMATICS (CMSAM), 2017, : 425 - 431