共 50 条
- [2] A particle swarm optimization for resource-constrained multi-project scheduling problem [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
- [6] Two-stage algorithm for resource-constrained multi-project scheduling problem [J]. Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
- [7] Hybrid genetic algorithm for resource constrained multi-project scheduling problem [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
- [8] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
- [9] A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1038 - +