A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem

被引:4
|
作者
Deng Lin-yi [1 ,2 ]
Wang Yun-long [2 ]
Lin Yan [2 ]
机构
[1] Dalian Univ Technol, Dept Comp, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Ship CAD Engn Ctr, Dalian 116024, Peoples R China
关键词
Particle swarm optimization; Project scheduling; Resource-constrained; Priority rule;
D O I
10.1109/CCDC.2008.4597470
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider the resource-constrained multi-project scheduling problem (RCMPSP) and makespan minimization as objective. We present a new particle swarm optimization (PSO) approach to solve this problem. The particle representation is based on priority rules. The potential solution to the RCMPSP is, i.e., a sequence of priority rules deciding the order of scheduling the non-dummy activities, is represented by the multidimensional particle position. Hence PSO is applied to search the optimal schedule for the RCMPSP, in which a serial schedule generate scheme is adopted to transform the particle-represented priority rule to a schedule. Computational analyses are represented to verify the effective of the proposed methodology.
引用
收藏
页码:1038 / +
页数:2
相关论文
共 50 条
  • [1] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [2] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [3] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    [J]. 2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,
  • [4] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [5] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Jia, Qiong
    Seo, Yoonho
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2627 - 2638
  • [6] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Qiong Jia
    Yoonho Seo
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
  • [7] Hybrid differential evolution particle swarm optimization (DEA-DCWPSO) for resource-constrained multi-project scheduling problem
    Wang, Haixin
    Chen, Xin
    Wei, Shengsong
    Wang, Yanjie
    [J]. JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2022, 22 (03) : 957 - 969
  • [8] Particle swarm optimization for resource-constrained project scheduling
    Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong
    不详
    [J]. Int. J. Proj. Manage., 2006, 1 (83-92):
  • [9] Application of Hybrid Particle Swarm Optimization in Resource Constrained Multi-project Scheduling
    Du Hui
    Lou Pei-Huang
    Ye Wen-Hua
    [J]. JOURNAL OF THE CHINESE SOCIETY OF MECHANICAL ENGINEERS, 2014, 35 (05): : 371 - 379
  • [10] Application of hybrid particle swarm optimization in resource constrained multi-project scheduling
    Du, Hui
    Lou, Pei-Huang
    Ye, Wen-Hua
    [J]. Journal of the Chinese Society of Mechanical Engineers, Transactions of the Chinese Institute of Engineers, Series C/Chung-Kuo Chi Hsueh Kung Ch'eng Hsuebo Pao, 2014, 35 (05): : 371 - 379