An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem

被引:15
|
作者
Hu, Wenbin [1 ]
Wang, Huan [1 ]
Peng, Chao [1 ]
Wang, Huang [1 ]
Liang, Huangle [1 ]
Du, Bo [1 ]
机构
[1] Wuhan Univ, Sch Comp, Wuhan 430072, Hubei, Peoples R China
关键词
Cellular automata; Fuzzy cell; Uncertainty; Multi-project scheduling; Outer-inner; PARALLEL GAUSSIAN-ELIMINATION; FROG-LEAPING ALGORITHM; GENETIC ALGORITHM; OPTIMIZATION; POLICIES; AUCTION; RCPSP;
D O I
10.1007/s00500-014-1395-5
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Current research on the resource-constrained multi-project scheduling problem(RCMPSP) mainly focuses on the constrained resources or other single uncertainty factor that cannot satisfy the practical need of enterprise management. This paper addresses the dynamic uncertain multi-project scheduling problem (DUMPSP), which alleviates the above problem of RCMPSP by synthesizing the analysis of uncertainty, sensitivity, and lean management of resources and durations. An outer-inner uncertainty fuzzy cellular automata algorithm (OIUFCA) is proposed to solve DUMPSP. The problem is divided into several parts: (1) fuzzy cell is employed to describe the project cell and process cell in DUMPSP; (2) a fuzzy outer cellular automata (FOCA) model is defined to solve the project scheduling of DUMPSP, and a fuzzy inner cellular automata (FICA) model is constructed to solve the process scheduling; (3) multi-level feedback strategy (MFS) is further proposed to deal with the multi-level dual-stage optimization problem of DUMPSP. Besides, FOCA and FICA model execute co-evolution under the control of MFS. Extensive experiments are carried out to evaluate the performances of OIUFCA with other state-of-the-art algorithms. It is revealed that OIUFCA achieves a better performance in success rate and convergence speed in solving DUMPSP, and OIUFCA has a good solution under different conditions of uncertainty, sensibility, and lean management.
引用
收藏
页码:2111 / 2132
页数:22
相关论文
共 50 条
  • [31] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283
  • [32] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [33] Modeling and improved algorithm for resource constrained multi-project scheduling problem based on project splitting with resource transfer time
    Zhu H.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (03): : 586 - 597
  • [34] Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
    Aghileh, Marzieh
    Tereso, Anabela
    Alvelos, Filipe
    Monteiro Lopes, Maria Odete
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2024, 12 (01):
  • [35] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems
    Chen, James C.
    Jaong, Wun-Hao
    Sun, Cheng-Ju
    Lee, Hung-Yu
    Wu, Jenn-Sheng
    Ku, Chung-Chao
    ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
  • [36] Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem
    Shi, Yuanxun
    Du, Zongzhan
    Li, Jianxun
    2019 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL AND BUSINESS ENGINEERING (ICIBE 2019), 2019, : 123 - 127
  • [37] An agent-based simulation system for multi-project scheduling under uncertainty
    Song, Wen
    Xi, Hui
    Kang, Donghun
    Zhang, Jie
    SIMULATION MODELLING PRACTICE AND THEORY, 2018, 86 : 187 - 203
  • [38] AN EFFICIENT GENETIC ALGORITHM FOR DECENTRALIZED MULTI-PROJECT SCHEDULING WITH RESOURCE TRANSFERS
    Zhang, Jingwen
    Liu, Wanjun
    Liu, Wanlin
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 1 - 24
  • [39] Resource constrained multi-project scheduling modeling under certainty and uncertainty duration
    Hu, Wen-Bin
    Yue, Yu
    Xu, Long
    Wang, Kai-Kai
    Xia, Chang
    Du, Bo
    Song, Wei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (11): : 2398 - 2408
  • [40] Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
    Peng, Wuliang
    Yu, Dongmin
    Lin, Jiali
    IEEE ACCESS, 2023, 11 : 64370 - 64382