Design features of Three Gorges-Changzhou ±500 kV HVDC project

被引:0
|
作者
Liu, ZH
机构
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
in this paper, design results of Three Gorges-Changzhou HVDC Project were summarized. The major features of this project were introduced. In specifying performance requirements, the special features of this project, conditions and requirements of both side AC systems as well as environment conditions and requirements were considered carefully. The most up to date technology of HVDC and computerized controls were followed. Efforts have been paid to promote development of HVDC technology and to minimize the cost of the project with the basis of ensuring security and stability of the AC/DC systems.
引用
收藏
页码:12 / 16
页数:5
相关论文
共 50 条
  • [31] Hybrid Simulation of ±500 kV HVDC Power Transmission Project Based on Advanced Digital Power System Simulator
    Lei Chen
    Kan-Jun Zhang
    Yong-Jun Xia
    Gang Hu
    Journal of Electronic Science and Technology, 2013, 11 (01) : 66 - 71
  • [32] Lightning performance of 500 kV double-circuit line on same tower of the Three Gorges outgoing lines
    Huang, Weigang
    Zhongguo Dianli/Electric Power, 2000, 33 (05): : 57 - 61
  • [33] DESIGN STUDIES FOR THE MEAD-PHOENIX 500 KV AC TRANSMISSION PROJECT
    THALLAM, RS
    LUNDQUIST, TG
    ATMURI, SR
    SELIN, DA
    IEEE TRANSACTIONS ON POWER DELIVERY, 1995, 10 (04) : 1862 - 1874
  • [34] Introduction of 500 kV Three Corges-Changzou Electric Power Transmission Project
    Gong Dawei
    Yu Dunyao
    Electricity, 1997, (04) : 31 - 35
  • [35] Features of recent scouring and silting of the river channel of the Jingjiang River downstream of the Three Gorges Project
    Zhu, Y. H.
    Guo, X. H.
    Qu, G.
    Tang, F.
    Gu, L. H.
    RIVER SEDIMENTATION, 2017, : 166 - 166
  • [36] Features and causes of sediment deposition and erosion in Jingjiang reach after impoundment of the Three Gorges Project
    Sun, Z.-H. (Lnszh@126.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (45):
  • [37] Commutation Failure Analysis and Control System Optimization for Lin-Feng ±500kV HVDC Transmission Project
    Wu, Yanwei
    Zhou, Xiaofeng
    Li, Ye
    Wang, Yatao
    Cao, Sen
    INTERNATIONAL CONFERENCE ON ELECTRICAL AND CONTROL ENGINEERING (ICECE 2015), 2015, : 352 - 359
  • [38] Overview on hydraulic design of the flood-release deep outlets of Three Gorges project
    Zhou, Chi
    He, Yong
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (02): : 31 - 35
  • [39] Safety monitoring design and implementation of RCC cofferdam on the right bank of Three Gorges Project
    Dai, ZL
    Xiao, HJ
    Liu, XS
    Zhou, X
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 1089 - 1093
  • [40] DESIGN OF MICA HYDROELECTRIC PROJECT - MAJOR 500 KV SF6 INSTALLATION
    HANDEL, RD
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (05): : 1535 - 1545