共 50 条
- [32] Lightning performance of 500 kV double-circuit line on same tower of the Three Gorges outgoing lines Zhongguo Dianli/Electric Power, 2000, 33 (05): : 57 - 61
- [35] Features of recent scouring and silting of the river channel of the Jingjiang River downstream of the Three Gorges Project RIVER SEDIMENTATION, 2017, : 166 - 166
- [36] Features and causes of sediment deposition and erosion in Jingjiang reach after impoundment of the Three Gorges Project Sun, Z.-H. (Lnszh@126.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (45):
- [37] Commutation Failure Analysis and Control System Optimization for Lin-Feng ±500kV HVDC Transmission Project INTERNATIONAL CONFERENCE ON ELECTRICAL AND CONTROL ENGINEERING (ICECE 2015), 2015, : 352 - 359
- [38] Overview on hydraulic design of the flood-release deep outlets of Three Gorges project Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (02): : 31 - 35
- [39] Safety monitoring design and implementation of RCC cofferdam on the right bank of Three Gorges Project ROLLER COMPACTED CONCRETE DAMS, 2003, : 1089 - 1093
- [40] DESIGN OF MICA HYDROELECTRIC PROJECT - MAJOR 500 KV SF6 INSTALLATION IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1977, 96 (05): : 1535 - 1545