共 50 条
- [1] Channel evolution of Jingjiang reach and its influences on waterway after impoundment of the Three Gorges Project Yingyong Jichu yu Gongcheng Kexue Xuebao/Journal of Basic Science and Engineering, 2010, 18 (01): : 1 - 10
- [2] Responses of erosion and deposition in the Jingjiang reach to sediment delivery of the Three Gorges Reservoir during flood season Shuikexue Jinzhan/Advances in Water Science, 2023, 34 (01): : 115 - 125
- [3] Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 2179 - +
- [4] Transport characteristics of non-uniform suspended sediment in the Jingjiang Reach after the Three Gorges Project operation Hupo Kexue/Journal of Lake Sciences, 2021, 33 (06): : 1898 - 1905
- [5] The suitable ecological discharge of the Jingjiang Reach after the operation of Three Gorges Project Hupo Kexue/Journal of Lake Sciences, 2024, 36 (06): : 1900 - 1910
- [10] Research on Characteristics of Sediment in Yichang-Wuhan Reach after Impoundment of the Three Gorges PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 2250 - +