共 50 条
- [21] Effects of the Three Gorges Project operation on the recent variation in bankfull channel geometry of the Jingjiang Reach Shuikexue Jinzhan/Advances in Water Science, 2016, 27 (03): : 385 - 391
- [23] Characteristics of channel adjustments and bank erosion in the Chenghan reach after the Three Gorges Project operation Hupo Kexue/Journal of Lake Sciences, 2019, 31 (05): : 1447 - 1458
- [24] Variation in water and sediment conditions and erosion and deposition characteristics in the reach between Three Gorges Dam and Gezhou Dam Shuikexue Jinzhan/Advances in Water Science, 2020, 31 (06): : 875 - 884
- [25] Variation in sediment transport in the Jingjiang River during the initial impounding period of the Three Gorges Project PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 689 - 694
- [26] Impact of the Three Gorges Dam on sediment deposition and erosion in the middle Yangtze River: a case study of the Shashi Reach HYDROLOGY RESEARCH, 2016, 47 : 175 - 186
- [27] Channel degradation in the Yangtze River after the impoundment of the Three Gorges Project SEDIMENT PROBLEMS AND SEDIMENT MANAGEMENT IN ASIAN RIVER BASINS, 2011, 349 : 154 - 162
- [29] Bank and point bar morphodynamics in the Lower Jingjiang Reach of the Yangtze River in response to the Three Gorges Project Journal of Geographical Sciences, 2022, 32 : 1530 - 1556