共 50 条
- [42] System Design of ±420 kV Chongqing-Hubei Back-to-Back HVDC Project of China Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (05): : 175 - 183
- [43] Design on excavation and support of underground works for the conveyance system in the Three Gorges Project permanent shiplock Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 696 - 699
- [45] The design and application of the alternate climbing formwork to the III-stage RCC cofferdam of the Three Gorges Project ROLLER COMPACTED CONCRETE DAMS, 2003, : 541 - 544
- [46] Design and Testing of 500kV Double Circuit Monopoles for the Heartland Transmission Project in Edmonton, Alberta ELECTRICAL TRANSMISSION AND SUBSTATION STRUCTURES 2015: TECHNICAL CHALLENGES AND INNOVATIVE SOLUTIONS IN GRID MODERNIZATION, 2015, : 337 - 350
- [47] Development of an opto-electrical probe for measuring impulse high-voltage across thyristors in HVDC valve of three-gorges project APEC 2004: NINETEENTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION, VOLS 1-3, 2004, : 1849 - 1852