An Examination of Engineering Personnel Assignment Policies in the Multi-Project, Capacity Constrained Situation

被引:3
|
作者
Ash, Robert [1 ]
机构
[1] Indiana Univ SE, Sch Business, New Albany, IN 47150 USA
关键词
Project Management; Scheduling; Simulation; Resource Assignment; SCHEDULING PROBLEM; RESOURCE; PERFORMANCE;
D O I
10.1080/10429247.2009.11431845
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineering management is often done in a multi-project setting where projects arrive dynamically, engineering human resources are overloaded, and preemption is allowed. In this simulation research, factors of that setting are varied to identify ideal resource assignment policies associated with personnel capacity loading and the use of personnel preemption. The experimental factors include resource overloading, learning rate, and the frequency and length of preemption. The performance measures are project set flow time, resource utilization, and mean project duration. The best situation is one where preemption is not allowed but where engineering resources are overloaded to 200% of capacity. The results of this research are important for engineering resource utilization and for the timely project completion, and have the additional benefit of recommending a best practice for project initiation and engineering project portfolio management.
引用
收藏
页码:58 / 70
页数:13
相关论文
共 50 条
  • [41] Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process
    Singh, Amol
    [J]. 24TH DAAAM INTERNATIONAL SYMPOSIUM ON INTELLIGENT MANUFACTURING AND AUTOMATION, 2013, 2014, 69 : 725 - 734
  • [42] Bi-level decision method for multi-resource constrained multi-project scheduling
    Tan, Y.
    Zhong, W.J.
    Xu, N.R.
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2001, 21 (02):
  • [43] Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
    Chen, HaoJie
    Ding, Guofu
    Zhang, Jian
    Qin, Shengfeng
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [44] Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
    Han, Jinchi
    Chen, Chen
    Tiong, Robert Lee Kong
    Wu, Kan
    [J]. AUTOMATION IN CONSTRUCTION, 2024, 166
  • [45] A Novel Petri-Net Based Resource Constrained Multi-project Scheduling Method
    Hu, Wenbin
    Wang, Huan
    [J]. ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, ICA3PP 2014, PT I, 2014, 8630 : 270 - 284
  • [46] Two-stage algorithm for resource-constrained multi-project scheduling problem
    Chen J.-J.
    Tong S.-R.
    Ye Z.-G.
    Zhang J.-W.
    Wang Y.
    Nie Y.-F.
    Zhang Y.-Q.
    [J]. Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
  • [47] A NOVEL VIBRATION DAMPING OPTIMIZATION ALGORITHM FOR RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    Mehdizadeh, Esmaeil
    Akbari, Hamidreza
    [J]. ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2017, 51 (02): : 291 - 309
  • [48] Solving resource-constrained multi-project environment under different activity assumptions
    Ben Issa S.
    Patterson R.A.
    Tu Y.
    [J]. International Journal of Production Economics, 2021, 232
  • [49] A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem
    Bredael, Dries
    Vanhoucke, Mario
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 315 (02) : 19 - 34
  • [50] Multimode Resource-Constrained Multi-Project Scheduling with Ad Hoc Activity Splitting
    Joo, B. J.
    Chua, P. C.
    [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2261 - 2265