Bi-level decision method for multi-resource constrained multi-project scheduling

被引:0
|
作者
Tan, Y.
Zhong, W.J.
Xu, N.R.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] A heuristic method for resource constrained allocation in multi-project scheduling
    Ghomi, SMTF
    Ashjari, B
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 111 - 116
  • [2] Research on the multi-project task scheduling under multi-resource constraints
    School of Mechanical and Electrical Engineering, Harbin Institute of Technology, Harbin 150001, China
    不详
    [J]. Harbin Gongye Daxue Xuebao, 2007, 7 (1045-1049):
  • [3] Multi-mode resource constrained multi-project scheduling and resource portfolio problem
    Besikci, Umut
    Bilge, Umit
    Ulusoy, Gunduz
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) : 22 - 31
  • [4] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [5] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [6] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [7] Resource Constrained Multi-project Scheduling: Application in Software Company
    Kurt, Pelin Akyil
    Kececi, Baris
    [J]. ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 549 - 557
  • [8] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [9] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [10] The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem
    Wauters, Tony
    Kinable, Joris
    Smet, Pieter
    Vancroonenburg, Wim
    Vanden Berghe, Greet
    Verstichel, Jannes
    [J]. JOURNAL OF SCHEDULING, 2016, 19 (03) : 271 - 283