An Examination of Engineering Personnel Assignment Policies in the Multi-Project, Capacity Constrained Situation

被引:3
|
作者
Ash, Robert [1 ]
机构
[1] Indiana Univ SE, Sch Business, New Albany, IN 47150 USA
关键词
Project Management; Scheduling; Simulation; Resource Assignment; SCHEDULING PROBLEM; RESOURCE; PERFORMANCE;
D O I
10.1080/10429247.2009.11431845
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineering management is often done in a multi-project setting where projects arrive dynamically, engineering human resources are overloaded, and preemption is allowed. In this simulation research, factors of that setting are varied to identify ideal resource assignment policies associated with personnel capacity loading and the use of personnel preemption. The experimental factors include resource overloading, learning rate, and the frequency and length of preemption. The performance measures are project set flow time, resource utilization, and mean project duration. The best situation is one where preemption is not allowed but where engineering resources are overloaded to 200% of capacity. The results of this research are important for engineering resource utilization and for the timely project completion, and have the additional benefit of recommending a best practice for project initiation and engineering project portfolio management.
引用
收藏
页码:58 / 70
页数:13
相关论文
共 50 条
  • [31] The performance of priority rules for the decentralized resource-constrained multi-project scheduling
    Mao, Hongri
    Yuan, Jianbo
    [J]. Knowledge-Based Systems, 2024, 304
  • [32] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [33] On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
    Wang, Yanting
    He, Zhengwen
    Kerkhove, Louis-Phillipe
    Vanhoucke, Mario
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 223 - 234
  • [34] A Modified Differential Evolution Algorithm for Resource Constrained Multi-project Scheduling Problem
    Yan, Rui
    Li, Weijia
    Jiang, Ping
    Zhou, Yinzhi
    Wu, Guoqing
    [J]. JOURNAL OF COMPUTERS, 2014, 9 (08) : 1922 - 1927
  • [35] Application of hybrid particle swarm optimization in resource constrained multi-project scheduling
    Du, Hui
    Lou, Pei-Huang
    Ye, Wen-Hua
    [J]. Journal of the Chinese Society of Mechanical Engineers, Transactions of the Chinese Institute of Engineers, Series C/Chung-Kuo Chi Hsueh Kung Ch'eng Hsuebo Pao, 2014, 35 (05): : 371 - 379
  • [36] EXPERIMENTAL IMPLEMENTATION OF A RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM SOLVER
    Mihaly, Krisztian
    Forrai, Monika Kulcsarne
    Kulcsar, Gyula
    [J]. HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 2021, 49 (02): : 53 - 58
  • [37] Supply chain integrated resource-constrained multi-project scheduling problem
    Asadujjaman, Md.
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 194
  • [38] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [39] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Rob Van Eynde
    Mario Vanhoucke
    [J]. Journal of Scheduling, 2020, 23 : 301 - 325
  • [40] Resource constrained multi-project scheduling modeling under certainty and uncertainty duration
    Hu, Wen-Bin
    Yue, Yu
    Xu, Long
    Wang, Kai-Kai
    Xia, Chang
    Du, Bo
    Song, Wei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (11): : 2398 - 2408