The performance of priority rules for the decentralized resource-constrained multi-project scheduling

被引:0
|
作者
Mao, Hongri [1 ]
Yuan, Jianbo [1 ]
机构
[1] School of Traffic & Transportation Engineering, Changsha University of Science & technology, Changsha,410114, China
基金
中国国家自然科学基金;
关键词
Decentralized control;
D O I
10.1016/j.knosys.2024.112530
中图分类号
学科分类号
摘要
Decentralized resource-constrained multi-project scheduling (DRCMPSP) is becoming increasingly common in construction, supply chains, and many other industrial disciplines. DRCMPSP faces difficult decisions in resolving resource conflicts to generate a baseline schedule to optimize global objectives. We propose an agent-based approach to address the DRCMPSP based on two global objectives: average project delay and total project delay. A heuristic based on the priority rule (PR) is developed to coordinate the global resource allocation. A comprehensive analysis of 30 PRs was conducted on 16,000 portfolios containing 48,000 projects. We confirmed that using the same PR to allocate global resources on all occasions often results in unnecessarily poor performance. The best PR depends on project and portfolio characteristics such as serial/parallel indicators, global resource distribution, and tightness. Moreover, the best PR differs from various perspectives (e.g., projects and portfolios). We summarized our results in three decision tables and further distilled these results for practical use, which only provide a rough estimate of the project and portfolio characteristics. © 2024 Elsevier B.V.
引用
收藏
相关论文
共 50 条
  • [1] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [2] The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation
    Melchiors, Philipp
    Kolisch, Rainer
    Kanet, John J.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 569 - 595
  • [3] On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem
    Wang, Yanting
    He, Zhengwen
    Kerkhove, Louis-Phillipe
    Vanhoucke, Mario
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 223 - 234
  • [4] Resource Constrained Multi-Project Scheduling with Priority Rules & Analytic Hierarchy Process
    Singh, Amol
    [J]. 24TH DAAAM INTERNATIONAL SYMPOSIUM ON INTELLIGENT MANUFACTURING AND AUTOMATION, 2013, 2014, 69 : 725 - 734
  • [5] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [6] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [7] Efficient Priority Rules for Resource Allocation of Stochastic Decentralized Multi-Project Scheduling Problem
    Mao, Hongri
    Yuan, Jianbo
    Mao, Ying
    Zhang, Shixuan
    [J]. IEEE ACCESS, 2024, 12 : 112729 - 112741
  • [8] Efficient priority rules for the resource-constrained project scheduling problem
    Kolisch, Rainer
    [J]. Journal of Operations Management, 1996, 14 (03): : 179 - 192
  • [9] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Van Eynde, Rob
    Vanhoucke, Mario
    [J]. JOURNAL OF SCHEDULING, 2020, 23 (03) : 301 - 325
  • [10] Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling
    Rob Van Eynde
    Mario Vanhoucke
    [J]. Journal of Scheduling, 2020, 23 : 301 - 325