共 50 条
- [21] Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival [J]. IEEE ACCESS, 2023, 11 : 64370 - 64382
- [22] Optimizing for a Resource-constrained Multi-project Scheduling Problem with Planned Resource Unavailability [J]. PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION AND APPLIED MATHEMATICS (MSAM 2018), 2018, 160 : 243 - 248
- [23] A particle swarm optimization for resource-constrained multi-project scheduling problem [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
- [24] EXPERIMENTAL IMPLEMENTATION OF A RESOURCE-CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM SOLVER [J]. HUNGARIAN JOURNAL OF INDUSTRY AND CHEMISTRY, 2021, 49 (02): : 53 - 58
- [26] Research on resource-constrained project scheduling method based on heuristic priority rules [J]. Computer Modelling and New Technologies, 2014, 18 (01): : 143 - 150
- [29] Two-stage algorithm for resource-constrained multi-project scheduling problem [J]. Chen, Jun-Jie (junjiechen75@nwpu.edu.cn), 2013, Northeast University (35): : 2013 - 2020
- [30] Multimode Resource-Constrained Multi-Project Scheduling with Ad Hoc Activity Splitting [J]. 2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2261 - 2265