A Novel Petri-Net Based Resource Constrained Multi-project Scheduling Method

被引:0
|
作者
Hu, Wenbin [1 ]
Wang, Huan [1 ]
机构
[1] Wuhan Univ, Sch Comp, Wuhan, Hubei Province, Peoples R China
关键词
RCPSP; Petri-Nets; Simulation; modeling; ALGORITHM;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
This work proposes an extended Petri-Nets for resource constrained project scheduling problem (RCPSP). Several important issues about Petri-Nets on RCPSP are discussed in this paper. Firstly, the most important elements in Petri-Nets on RCPSP, including waiting place, activity place, resource place and final place, are designed. At the same time, three kinds of transitions are designed. They are coordination transition, resource allocating transition and resource releasing transition. Secondly, the Petri-Nets are improved according to the varying with increase or decrease of the number of resource acquisition. In this extended Petri-net, for the foremost difference with conventional Petri-Nets is to add a place and replace a releasing transition by the delaying transition and the firing rules of transition. Extensive experiments are performed to evaluate the performances of the proposed Petri-Nets against the state-of-art algorithms. The simulation experimental results of difference sides showed that extended Petri-Nets provides a more efficient way to solve RCPSP and produces competitive results compared with other methods investigated in this works.
引用
收藏
页码:270 / 284
页数:15
相关论文
共 50 条
  • [1] A heuristic method for resource constrained allocation in multi-project scheduling
    Ghomi, SMTF
    Ashjari, B
    [J]. IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY, 2002, 26 (B1): : 111 - 116
  • [2] A PETRI-NET BASED APPROACH FOR SCHEDULING AND RESCHEDULING RESOURCE-CONSTRAINED MULTIPLE PROJECTS
    Kao, Hsing-Pei
    Hsieh, Ben
    Yeh, Yingchieh
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 468 - 477
  • [3] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [4] Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times
    Suresh, M.
    Dutta, Pankaj
    Jain, Karuna
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [5] Resource-constrained multi-project scheduling problem: A survey
    Gomez Sanchez, Mariam
    Lalla-Ruiz, Eduardo
    Gil, Alejandro Fernandez
    Castro, Carlos
    Voss, Stefan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 309 (03) : 958 - 976
  • [6] Resource Constrained Multi-project Scheduling: Application in Software Company
    Kurt, Pelin Akyil
    Kececi, Baris
    [J]. ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 549 - 557
  • [7] A genetic algorithm for the resource constrained multi-project scheduling problem
    Goncalves, J. F.
    Mendes, J. J. M.
    Resende, M. G. C.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1171 - 1190
  • [8] HEURISTIC FRAMEWORK FOR THE RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    KIM, SO
    SCHNIEDERJANS, MJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1989, 16 (06) : 541 - 556
  • [9] Bi-level decision method for multi-resource constrained multi-project scheduling
    Tan, Y.
    Zhong, W.J.
    Xu, N.R.
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2001, 21 (02):
  • [10] A NOVEL VIBRATION DAMPING OPTIMIZATION ALGORITHM FOR RESOURCE CONSTRAINED MULTI-PROJECT SCHEDULING PROBLEM
    Mehdizadeh, Esmaeil
    Akbari, Hamidreza
    [J]. ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2017, 51 (02): : 291 - 309