Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis

被引:90
|
作者
Wu, Yunna [1 ,2 ]
Li, Lingwenying [1 ,2 ]
Xu, Ruhang [1 ,2 ]
Chen, Kaifeng [1 ,2 ]
Hu, Yong [1 ,2 ]
Lin, Xiaoshan [1 ,2 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing, Peoples R China
[2] North China Elect Power Univ, Beijing Key Lab New Energy & Low Carbon Dev, Beijing 102206, Peoples R China
关键词
PPP mode; Straw-based power generation; Risk assessment; Fuzzy synthetic evaluation; LIFE-CYCLE ASSESSMENT; SUPPLY CHAIN; INFRASTRUCTURE PROJECTS; PERFORMANCE EVALUATION; ENERGY PROJECTS; PPP PROJECTS; ALLOCATION; MALAYSIA; SUCCESS; CHALLENGES;
D O I
10.1016/j.jclepro.2017.06.008
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the increasing requirement on energy saving, emission reduction and environmental protection in China, the straw-based power generation is developing rapidly, which can not only provide clean energy, but also address the serious environmental problems caused by farmers' burning straw directly. Currently, the government is gradually applying Public-Private-Partnership model to this field making use of private sectors' capital and technological advantages. To assess the risks in public-private partnership straw-based power generation projects in China, 44 risk factors were identified and 19 critical risks factors (CRFs) were selected and classified into 4 groups (CRGs) based on a questionnaire survey in this paper. Then, the likelihood of occurrence (LO), magnitude of impact (MI), the integrated risk level (IRL) of each CRF, CRG and the overall risk were calculated through the fuzzy synthetic evaluation method. The CRF "government invention" was the most critical risk factor and the CRG "project participant risk" was the most critical risk factor group. Overall, the final fuzzy synthesis result indicated that the IRL of the public-private partnership straw-based power generation projects in China was high. Finally, some recommendations were given for each CRF. The evaluation index system, the multi-criteria fuzzy synthetic evaluation framework, the obtained conclusions and the risk response measures in this paper can help policy makers and project decision makers make appropriate decisions and allocate the limited resources to the risks worthy more attention. Simultaneously, this paper can provide a reference for the private sector to avoid too risky project and at the same time facilitate the public sector to take effective measures reducing project risks so as to attract more high-quality private capital. In addition, the risk assessment in public-private partnership straw-based power generation projects has not been discussed and paid enough attention yet. Thus, this study expands the knowledge and contributes to the literature. (C) 2017 Elsevier Ltd. All rights reserved.
引用
下载
收藏
页码:977 / 990
页数:14
相关论文
共 50 条
  • [21] Application of risk analysis and allocation model on public-private partnership power transmission line projects
    Kate, Ganesh Sadashiv
    Patil, Pandurang Shanakar
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2020, 16 (03) : 240 - 254
  • [22] Modelling critical success factors (CSFs) for Ghanaian public-private partnership (PPP) power projects using fuzzy synthetic evaluation (FSE)
    Kukah, Augustine Senanu Komla
    Owusu-Manu, De-Graft
    Badu, Edward
    Edwards, David John
    Asamoah, Eric
    JOURNAL OF FACILITIES MANAGEMENT, 2023,
  • [23] Risk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors
    Cheung, Esther
    Chan, Albert P. C.
    JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2011, 137 (04) : 409 - 415
  • [24] Risk-based integrated performance assessment framework for public-private partnership infrastructure projects
    Fatima, Anam
    Mubin, Sajjad
    Masood, Rehan
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2024, 16 (01): : 251 - 274
  • [25] Fuzzy Analysis of Financial Risk Management Strategies for Sustainable Public-Private Partnership Infrastructure Projects in Ghana
    Akomea-Frimpong, Isaac
    Jin, Xiaohua
    Osei-Kyei, Robert
    INFRASTRUCTURES, 2024, 9 (04)
  • [26] Fuzzy financial risk analysis of net-zero transitions in public-private partnership projects in Ghana
    Akomea-Frimpong, Isaac
    Jin, Xiaohua
    Osei-Kyei, Robert
    JOURNAL OF FACILITIES MANAGEMENT, 2024,
  • [27] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2020, 67 (02) : 376 - 384
  • [28] Study on Identification of Spurious Public-Private Partnership Projects in China
    Liang, Qingxue
    Hu, Hao
    IEEE Transactions on Engineering Management, 2020, 67 (02): : 376 - 384
  • [29] Evaluation of risk factors in Ghanaian public-private-partnership (PPP) power projects using fuzzy synthetic evaluation methodology (FSEM)
    Kukah, Augustine Senanu Komla
    Owusu-Manu, De-Graft
    Badu, Edward
    Edwards, David John
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2023, 30 (08) : 2554 - 2582
  • [30] Risk assessment of sewage treatment Public Private Partnership projects in China
    Zhao, Hui
    Zhang, Jingqi
    Li, Zhijie
    DESALINATION AND WATER TREATMENT, 2022, 249 : 119 - 134