Investigating the causes of delay in grain bin construction projects: the case of China

被引:22
|
作者
Chen, Gui-Xiang [1 ]
Shan, Ming [2 ]
Chan, Albert P. C. [3 ]
Liu, Xu [4 ]
Zhao, Yi-Qing [5 ]
机构
[1] Henan Univ Technol, Sch Civil Engn & Architecture, Dept Engn Management, Zhengzhou, Henan, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore, Singapore
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[4] Henan Acad Bldg & Construct, Zhengzhou, Henan, Peoples R China
[5] Tongji Univ, Sch Econ & Management, Dept Management Sci & Engn, Shanghai, Peoples R China
关键词
Cause of delay; grain bin projects; factor analysis; structural equation modelling; CRITICAL SUCCESS FACTORS; MANAGEMENT RESEARCH; PERFORMANCE; SECTOR; RISKS; PLS;
D O I
10.1080/15623599.2017.1354514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment,' 'poor communication among contracting parties,' 'problems with subcontractors,' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 50 条
  • [41] Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects
    Banobi, Edwin Thomas
    Jung, Wooyong
    SUSTAINABILITY, 2019, 11 (21)
  • [42] Developing a user plug-in to assess delay causes' impact on construction projects in Egypt
    Elhusseiny, Hayssam O.
    Nosair, Ibrahim
    Ezeldin, A. Samer
    AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (04) : 3553 - 3568
  • [43] Investigating the Components of Innovation in Construction Projects
    Ozorhon, Beliz
    Oral, Kutluhan
    Demirkesen, Sevilay
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (03)
  • [44] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [45] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [46] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [47] Causes of government construction projects' abandonment
    Damoah, Isaac Sakyi
    Ayakwa, Anthony
    Kumi, Desmond Kwadjo
    JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (04) : 179 - 190
  • [48] CAUSES OF REWORK IN CONSTRUCTION PROJECTS IN UKRAINE
    Trach, R.
    Pawluk, K.
    Lendo-Siwicka, M.
    ARCHIVES OF CIVIL ENGINEERING, 2019, 65 (03) : 61 - 74
  • [49] CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY
    Kazaz, Aynur
    Ulubeyli, Serdar
    Tuncbilekli, Nihan Avcioglu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (03) : 426 - 435
  • [50] Construction projects: interactions of the causes of delays
    Purushothaman, Mahesh Babu
    San Pedro, Leo Neil Resurreccion
    GhaffarianHoseini, Ali
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2024,