Investigating the causes of delay in grain bin construction projects: the case of China

被引:22
|
作者
Chen, Gui-Xiang [1 ]
Shan, Ming [2 ]
Chan, Albert P. C. [3 ]
Liu, Xu [4 ]
Zhao, Yi-Qing [5 ]
机构
[1] Henan Univ Technol, Sch Civil Engn & Architecture, Dept Engn Management, Zhengzhou, Henan, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore, Singapore
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[4] Henan Acad Bldg & Construct, Zhengzhou, Henan, Peoples R China
[5] Tongji Univ, Sch Econ & Management, Dept Management Sci & Engn, Shanghai, Peoples R China
关键词
Cause of delay; grain bin projects; factor analysis; structural equation modelling; CRITICAL SUCCESS FACTORS; MANAGEMENT RESEARCH; PERFORMANCE; SECTOR; RISKS; PLS;
D O I
10.1080/15623599.2017.1354514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment,' 'poor communication among contracting parties,' 'problems with subcontractors,' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 50 条
  • [21] Causes of Delay in the Planning and Design Phases for Construction Projects
    Yang, Jyh-Bin
    Wei, Pei-Rei
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2010, 16 (02) : 80 - 83
  • [22] Analysis of Causes of Delay and Time Performance in Construction Projects
    Gonzalez, Pablo
    Gonzalez, Vicente
    Molenaar, Keith
    Orozco, Francisco
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [23] Causes of Delay in Various Construction Projects: A Literature Review
    Mbala, Mbuyamba
    Aigbavboa, Clinton
    Aliu, John
    ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 489 - 495
  • [24] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    OPEN ENGINEERING, 2022, 12 (01): : 702 - 715
  • [25] Analyzing Causes for Reworks in Construction Projects in China
    Ye, Gui
    Jin, Zhigang
    Xia, Bo
    Skitmore, Martin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [26] Investigating the types, causes and severity of claims in construction projects in the UAE
    Zaneldin, Essam K.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 385 - 401
  • [27] Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
    Abbas, Nagham Nawar
    Burhan, Abbas M.
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2022, 12 (01) : 8075 - 8079
  • [28] Investigating cost overruns and delay in urban construction projects in Iran
    Heravi, Gholamreza
    Mohammadian, Meghdad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (09) : 958 - 968
  • [29] Delay causes in Kazakhstan's construction projects and remedial measures
    Hossain, Md Aslam
    Raiymbekov, Dinmukhambet
    Nadeem, Abid
    Kim, Jong Ryeol
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (05) : 801 - 819
  • [30] Analysis of causes of delay in Indian construction projects and mitigation measures
    Prasad, K. V.
    Vasugi, V.
    Venkatesan, R.
    Bhat, Nikhil
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2019, 24 (01) : 58 - 78