Analyzing Causes for Reworks in Construction Projects in China

被引:112
|
作者
Ye, Gui [1 ]
Jin, Zhigang [2 ]
Xia, Bo [3 ]
Skitmore, Martin [3 ]
机构
[1] Chongqing Univ, Sch Construct & Real Estate, Chongqing 400045, Peoples R China
[2] Sichuan Univ, Coll Architecture & Environm, Chengdu 610065, Peoples R China
[3] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4001, Australia
关键词
Rework; Cause; Construction projects; Factor analysis; China; DELAYS; COSTS;
D O I
10.1061/(ASCE)ME.1943-5479.0000347
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although rework is a common phenomenon in the Chinese construction industry and significantly affects project success, the reasons for rework remain largely unknown and most construction companies are unable to manage the issue effectively. To investigate the causes of rework in construction projects, a total of 39 causes were first identified through a comprehensive literature review and semi-structured interviews with 13 experienced construction professionals in China. A questionnaire survey was further conducted to prioritize these causes, in which unclear project process management, poor quality of construction technology, and the use of poor construction materials rank the highest. Finally, a factor analysis revealed 11 major underlying dimensions of these causes, relating to design management, communication management, field management, project scope management, project process management, active rework, project plan changes, subcontractor management, contract management, owner capability, and the external environment. The contribution of this work lies in its examination of the underlying causes of rework perceived by construction professionals in the world's largest developing country, which is characterized by its unique economic and social systems. In particular, newly identifed causes of contract management, active rework, and scope management help expand existing knowledge of the underlying causes of rework for the global construction community. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    [J]. JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55
  • [2] Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects
    San Santoso, Djoen
    Soeng, Sothy
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)
  • [3] Analyzing Stakeholder Relationships for Construction Land Reduction Projects in Shanghai, China
    Lu, Zhaodi
    Xu, Mengyao
    Zhang, Zhengfeng
    [J]. LAND, 2022, 11 (12)
  • [4] Investigating Reworks in Green Building Construction Projects: Magnitude, Influential Factors, and Solutions
    Hwang, B. G.
    Shan, M.
    Tan, E. K.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH, 2016, 10 (04) : 499 - 510
  • [5] Time overruns in the construction projects in Iraq: Case study on investigating and analyzing the root causes
    Al Kulabi, Ahmed Kamil
    Atiea, Huda M. Jawad
    [J]. OPEN ENGINEERING, 2022, 12 (01): : 702 - 715
  • [6] Investigating the causes of delay in grain bin construction projects: the case of China
    Chen, Gui-Xiang
    Shan, Ming
    Chan, Albert P. C.
    Liu, Xu
    Zhao, Yi-Qing
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 1 - 14
  • [7] Analyzing the causes of falling from height accidents in construction projects with analytical hierarchy process (AHP)
    Vosouuhi, Shahram
    Chalak, Mohammad Hossein
    Rostamzadeh, Saiiad
    Jahanpanah, Manouchehr
    Ebrahimi, Hossein
    [J]. JOURNAL OF HEALTH AND SAFETY AT WORK, 2020, 10 (02) : 1 - 5
  • [8] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    [J]. SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [9] Reworks causes and related costs in construction: case of Parand mass housing project in Iran
    Balouchi, Mohammad
    Gholhaki, Majid
    Niousha, Ali
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2019, 36 (08) : 1392 - 1408
  • [10] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69