Investigating the causes of delay in grain bin construction projects: the case of China

被引:22
|
作者
Chen, Gui-Xiang [1 ]
Shan, Ming [2 ]
Chan, Albert P. C. [3 ]
Liu, Xu [4 ]
Zhao, Yi-Qing [5 ]
机构
[1] Henan Univ Technol, Sch Civil Engn & Architecture, Dept Engn Management, Zhengzhou, Henan, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore, Singapore
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[4] Henan Acad Bldg & Construct, Zhengzhou, Henan, Peoples R China
[5] Tongji Univ, Sch Econ & Management, Dept Management Sci & Engn, Shanghai, Peoples R China
关键词
Cause of delay; grain bin projects; factor analysis; structural equation modelling; CRITICAL SUCCESS FACTORS; MANAGEMENT RESEARCH; PERFORMANCE; SECTOR; RISKS; PLS;
D O I
10.1080/15623599.2017.1354514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment,' 'poor communication among contracting parties,' 'problems with subcontractors,' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 50 条
  • [1] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [2] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [3] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [4] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    Int. J. Proj. Manage., 2006, 4 (349-357):
  • [5] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [6] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55
  • [7] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [8] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [9] Causes of Delay in Smart and Complex Construction Projects
    Radman, Kambiz
    Babaeian Jelodar, Mostafa
    Ghazizadeh, Eghbal
    Wilkinson, Suzanne
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)
  • [10] Causes of Delay in Public Construction Projects in Iraq
    Bekr, Ghanim A.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2015, 9 (02) : 149 - 162