Review of Delay Causes in Construction Projects

被引:0
|
作者
AlGheth, Abdulhamid [1 ]
Sayuti, Md Ishak [1 ]
机构
[1] Univ Sains Malaysia, Sch Civil Engn, Nibong Tebal, Penang, Malaysia
关键词
Construction delay; Construction; Delay factors management;
D O I
10.1007/978-3-030-32816-0_28
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction delay is the one of major factors globally which have a high impact in countries' economy and development in UAE and any other countries. The present paper reports an exploratory research study of previous international research into delay factors affecting project delivery. The objective of this research was to provide a general overview of construction delays in order to recognize the main groups of delays and compare the UAE construction projects with international studies. In total, 14 groups were found to contribute to causing construction delays. Studies of the international and UAE construction industry are in agreement that the main group of factors that affect project completion are management factors; then, the second group comprises financial factors however the top 3 groups in UAE are contractor management group, client financial group and the client management group. In international the top 3 groups are contractor management group, client management group and the third is contractor financial group.
引用
收藏
页码:429 / 437
页数:9
相关论文
共 50 条
  • [1] Causes of Delay in Various Construction Projects: A Literature Review
    Mbala, Mbuyamba
    Aigbavboa, Clinton
    Aliu, John
    [J]. ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 489 - 495
  • [2] Causes of delay in construction projects in Oman
    Umar, Tariq
    [J]. MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [3] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [4] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [5] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    [J]. JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55
  • [6] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [7] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57
  • [8] Causes of Delay in Smart and Complex Construction Projects
    Radman, Kambiz
    Babaeian Jelodar, Mostafa
    Ghazizadeh, Eghbal
    Wilkinson, Suzanne
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2021, 13 (04)
  • [9] Causes of Delay in Public Construction Projects in Iraq
    Bekr, Ghanim A.
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2015, 9 (02) : 149 - 162
  • [10] Causes of Construction Delay for Housing Projects in Malaysia
    Ramli, M. Z.
    Nordin, A.
    Roslin, N. T.
    Hamid, N. B.
    Azman, N. S.
    Zahari, N. M.
    [J]. 5TH INTERNATIONAL CONFERENCE ON GREEN DESIGN AND MANUFACTURE 2019 (ICONGDM 2019), 2019, 2129