Review of Delay Causes in Construction Projects

被引:0
|
作者
AlGheth, Abdulhamid [1 ]
Sayuti, Md Ishak [1 ]
机构
[1] Univ Sains Malaysia, Sch Civil Engn, Nibong Tebal, Penang, Malaysia
关键词
Construction delay; Construction; Delay factors management;
D O I
10.1007/978-3-030-32816-0_28
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction delay is the one of major factors globally which have a high impact in countries' economy and development in UAE and any other countries. The present paper reports an exploratory research study of previous international research into delay factors affecting project delivery. The objective of this research was to provide a general overview of construction delays in order to recognize the main groups of delays and compare the UAE construction projects with international studies. In total, 14 groups were found to contribute to causing construction delays. Studies of the international and UAE construction industry are in agreement that the main group of factors that affect project completion are management factors; then, the second group comprises financial factors however the top 3 groups in UAE are contractor management group, client financial group and the client management group. In international the top 3 groups are contractor management group, client management group and the third is contractor financial group.
引用
收藏
页码:429 / 437
页数:9
相关论文
共 50 条
  • [31] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [32] Causes of delay in the global construction industry: a meta analytical review
    Sanni-Anibire, Muizz O.
    Zin, Rosli Mohamad
    Olatunji, Sunday Olusanya
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1395 - 1407
  • [33] Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects
    Banobi, Edwin Thomas
    Jung, Wooyong
    [J]. SUSTAINABILITY, 2019, 11 (21)
  • [34] Developing a user plug-in to assess delay causes' impact on construction projects in Egypt
    Elhusseiny, Hayssam O.
    Nosair, Ibrahim
    Ezeldin, A. Samer
    [J]. AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (04) : 3553 - 3568
  • [35] Review and assessment of the causes of deficiencies in design documents for large construction projects
    Assaf, Sadi
    Hassanain, Mohammad A.
    Abdallah, Abdullatif
    [J]. INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2018, 36 (03) : 300 - 317
  • [36] A review of causes of variation order in the construction of terrace housing projects in Malaysia
    Mohammad, Noraziah
    Hamzah, Zabidi
    [J]. 2018 INTERNATIONAL JOINT CONFERENCE ON METALLURGICAL AND MATERIALS ENGINEERING (JCMME 2018), 2019, 277
  • [37] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    [J]. SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [38] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [39] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [40] Causes of government construction projects' abandonment
    Damoah, Isaac Sakyi
    Ayakwa, Anthony
    Kumi, Desmond Kwadjo
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (04) : 179 - 190