Causes of delay in the global construction industry: a meta analytical review

被引:72
|
作者
Sanni-Anibire, Muizz O. [1 ]
Zin, Rosli Mohamad [1 ]
Olatunji, Sunday Olusanya [2 ]
机构
[1] UTM, Sch Civil Engn, Fac Engn, Johor Baharu, Malaysia
[2] Univ Dammam, Coll Comp Sci & Informat Technol, Comp Sci Dept, Dammam, Saudi Arabia
关键词
Globalization; construction; delays; metadata analysis; systematic review; COST OVERRUNS; PROJECTS;
D O I
10.1080/15623599.2020.1716132
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry continues to suffer from efficiency and productivity losses such as delays. The effects of delays may include time and cost overruns, litigation and project abandonment. Thus, the global research domain is saturated with studies investigating the causes of construction delay. However, despite the rising trend of construction globalization, a systematic review of what has been achieved so far in construction delay research is lacking. Such a study will synthesize extant data from previous studies to illustrate the global picture and will be of potential benefit to concerned stakeholders. Consequently, this study presents an overall review of studies on the causes of construction delays and executes a meta-data analysis utilizing Relative Importance Index (RII) values from some influential studies in the last 15 years. 36 common delay causes investigated globally were identified, and the effect summaries derived from the meta-analysis showed that the top five causes include: "contractor's financial difficulties", "delay in approval of completed work", "slow delivery of materials", "poor site organization and coordination between various parties", and "poor planning of resources and duration estimation/scheduling".
引用
收藏
页码:1395 / 1407
页数:13
相关论文
共 50 条
  • [1] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    [J]. INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [2] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [3] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [4] The professionals' perspective on the causes of project delay in the construction industry
    Agyekum-Mensah, George
    Knight, Andrew David
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 828 - 841
  • [5] Causes of Delay in Various Construction Projects: A Literature Review
    Mbala, Mbuyamba
    Aigbavboa, Clinton
    Aliu, John
    [J]. ADVANCES IN HUMAN FACTORS, SUSTAINABLE URBAN PLANNING AND INFRASTRUCTURE, 2019, 788 : 489 - 495
  • [6] An Investigation of Causes of Delay Affecting the United Arab Emirates Construction Industry
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 403 - 413
  • [7] Causes of disputes in the construction industry - a systematic literature review
    Silva, Pramod Malaka
    Domingo, Niluka
    Ali, Noushad Ali Naseem Ameer
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2024, 29 (02) : 193 - 210
  • [8] An analysis of causes of disputes in the construction industry using analytical network process
    Cakmak, Emre
    Cakmak, Pinar Irlayici
    [J]. 2ND WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT, 2014, 109 : 183 - 187
  • [9] Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh
    Assafi, Mohammad Nafe
    Hoque, Md Ikramul
    Hossain, Md Mehrab
    [J]. INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2024, 42 (04) : 788 - 817
  • [10] Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol
    Shahsavand, Parvaneh
    Marefat, Akbar
    Parchamijalal, Majid
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (04) : 497 - 533