The professionals' perspective on the causes of project delay in the construction industry

被引:69
|
作者
Agyekum-Mensah, George [1 ]
Knight, Andrew David [2 ]
机构
[1] Coventry Univ, Dept Civil Engn Architecture & Bldg, Coventry, W Midlands, England
[2] Nottingham Trent Univ, Dept Construct Management, Nottingham, England
关键词
Project management; Construction management; Planning; Construction delays; Practitioners perspective; UK construction;
D O I
10.1108/ECAM-03-2016-0085
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Construction project delays are described as a universal problem, which has led to many empirical studies. However, most of these studies were based on the rankings by respondents, and they were rarely verified. Therefore, the purpose of this paper is to explore professional perspectives on the causes of delay in the construction industry, where there has been little explicit consideration on this subject in recent decades. Design/methodology/approach - A critical literature review and a qualitative approach was considered for a deeper and fresh understanding of the causes of delays, rather than recycling the existing themes and the risk of a statistically biased approach. A total of 41 interviews were undertaken which included the London Olympic 2012 project team. Findings - In all, 32 themes were identified, which were categorised into 15 categories of causes of delay in the construction projects. Almost two-thirds of the main themes are not ranked top 15 causes of delay. These include knowledge and competence shortage, poor commercial decisions, unnecessary health and safety restrictions, poor risk management and poor space and logistics management. Research limitations/implications - Due to the qualitative nature of the study, the findings might not be considered as representative. Practical implications - The findings provide consideration of the causes of delay in the construction industry as seen by practitioners, which should provide guidance to enhance performance. Originality/value - The study contributes to the better understanding of the causes of delays by using qualitative research strategy which is limited in the construction management literature. This study is an empirical investigation into the causes of delay in the twenty-first century and it represents an important edition to the body of knowledge within the subject area.
引用
下载
收藏
页码:828 / 841
页数:14
相关论文
共 50 条
  • [1] Causes of Delay in Construction Industry in Iran
    Kouchaknezhad, Mehran
    Ali, Abang Abdullah Abang
    Kadir, Mohammad Razali Abdul
    INTERNATIONAL CONSTRUCTION BUSINESS & MANAGEMENT SYMPOSIUM 2011: WINNING & SUSTAINABLE STRATEGIES FOR INTERNATIONAL PROJECTS, 2011, : 211 - 217
  • [2] CAUSES OF DELAY IN INDIAN CONSTRUCTION INDUSTRY
    Venkatesh, M. P.
    Renuka, S. M.
    Umarani, C.
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2768 - 2773
  • [3] Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh
    Assafi, Mohammad Nafe
    Hoque, Md Ikramul
    Hossain, Md Mehrab
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2024, 42 (04) : 788 - 817
  • [4] A Pilot Survey on Causes of Delay in Malaysian Construction Project
    Tawil, Norngainy Mohd
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    Arshad, Ishak
    Badaruzzaman, Wan Hamidon Wan
    BUILDING SURVEYING, FACILITIES MANAGEMENT AND ENGINEERING CONFERENCE (BSFMEC 2014), 2014, 15
  • [5] Causes of Delay on Highway Construction Project in Klang Valley
    Karunakaran, S.
    Ramli, M. Z.
    Malek, M. A.
    Musir, A. A.
    Imran, N. F.
    Fuad, N. F. S. M.
    Zawawi, M. H.
    Zainal, M. Z.
    GREEN DESIGN AND MANUFACTURE: ADVANCED AND EMERGING APPLICATIONS, 2018, 2030
  • [6] The professionals' perception on the main causes of wastes in the Moroccan construction industry
    Bajjou, Mohamed Saad
    Chafi, Anas
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON SMART CITY APPLICATIONS (SCA'18), 2018,
  • [7] Sustainable construction Practices: A perspective view of Indian construction industry professionals
    Gehlot, M.
    Shrivastava, S.
    Materials Today: Proceedings, 2022, 61 : 315 - 319
  • [8] Sustainable construction Practices: A perspective view of Indian construction industry professionals
    Gehlot, M.
    Shrivastava, S.
    MATERIALS TODAY-PROCEEDINGS, 2022, 61 : 315 - 319
  • [9] An analysis of causes of delay and cost overrun in construction of hydropower project
    Azam, Tamoor
    Jiang, Wang Song
    Malik, Sohail Ahmed
    Malik, Saqib Yaqoob
    Nilofar, Memoona
    Abbas, Zaheer
    Ullah, Ihsan
    JOURNAL OF PUBLIC AFFAIRS, 2022, 22 (03)
  • [10] Causes of delay in the global construction industry: a meta analytical review
    Sanni-Anibire, Muizz O.
    Zin, Rosli Mohamad
    Olatunji, Sunday Olusanya
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) : 1395 - 1407