The professionals' perspective on the causes of project delay in the construction industry

被引:69
|
作者
Agyekum-Mensah, George [1 ]
Knight, Andrew David [2 ]
机构
[1] Coventry Univ, Dept Civil Engn Architecture & Bldg, Coventry, W Midlands, England
[2] Nottingham Trent Univ, Dept Construct Management, Nottingham, England
关键词
Project management; Construction management; Planning; Construction delays; Practitioners perspective; UK construction;
D O I
10.1108/ECAM-03-2016-0085
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Construction project delays are described as a universal problem, which has led to many empirical studies. However, most of these studies were based on the rankings by respondents, and they were rarely verified. Therefore, the purpose of this paper is to explore professional perspectives on the causes of delay in the construction industry, where there has been little explicit consideration on this subject in recent decades. Design/methodology/approach - A critical literature review and a qualitative approach was considered for a deeper and fresh understanding of the causes of delays, rather than recycling the existing themes and the risk of a statistically biased approach. A total of 41 interviews were undertaken which included the London Olympic 2012 project team. Findings - In all, 32 themes were identified, which were categorised into 15 categories of causes of delay in the construction projects. Almost two-thirds of the main themes are not ranked top 15 causes of delay. These include knowledge and competence shortage, poor commercial decisions, unnecessary health and safety restrictions, poor risk management and poor space and logistics management. Research limitations/implications - Due to the qualitative nature of the study, the findings might not be considered as representative. Practical implications - The findings provide consideration of the causes of delay in the construction industry as seen by practitioners, which should provide guidance to enhance performance. Originality/value - The study contributes to the better understanding of the causes of delays by using qualitative research strategy which is limited in the construction management literature. This study is an empirical investigation into the causes of delay in the twenty-first century and it represents an important edition to the body of knowledge within the subject area.
引用
下载
收藏
页码:828 / 841
页数:14
相关论文
共 50 条
  • [21] A framework to standardize causes of construction delay
    Amarkhil, Qais
    Elwakil, Emad
    Hubbard, Bryan
    Byrd, Vetria L.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (11) : 1791 - 1804
  • [22] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [23] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    Int. J. Proj. Manage., 2006, 4 (349-357):
  • [24] Causes of construction delay: Traditional contracts
    Odeh, A.M.
    Battaineh, H.T.
    International Journal of Project Management, 2002, 20 (01) : 67 - 73
  • [25] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [26] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [27] Personality study of construction professionals in the Turkish construction industry
    Giritli, Heyecan
    Civan, Isilay
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (08): : 630 - 634
  • [28] Tackling stress of project management practitioners in the Australian construction industry: the causes, effects and alleviation
    Jin, Xiao-Hua
    Senaratne, Sepani
    Fu, Ye
    Tijani, Bashir
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (10) : 4016 - 4041
  • [29] Mobbing on construction professionals: causes, consequences, and precautions
    Erdis, Ercan
    Genc, Olcay
    Aydinli, Serkan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (10) : 987 - 996
  • [30] The root causes of construction project failure
    Shahhosseini, V
    Afshar, M. R.
    Amiri, O.
    SCIENTIA IRANICA, 2018, 25 (01) : 93 - 108