Developing a user plug-in to assess delay causes' impact on construction projects in Egypt

被引:0
|
作者
Elhusseiny, Hayssam O. [1 ]
Nosair, Ibrahim [1 ]
Ezeldin, A. Samer [2 ]
机构
[1] Ain Shams Univ, Dept Struct Engn, Cairo, Egypt
[2] Amer Univ Cairo, Dept Construct Engn, Cairo, Egypt
关键词
Construction Projects' Delays; User Plug-in; Building Information Modeling (BIM); Mitigation; ENGINEERING-RELATED DELAYS; BIM ADOPTION; COST; INDUSTRY;
D O I
10.1016/j.asej.2021.04.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There are three main criteria that account for a construction project's success: completion on-time, within budget, and following the specifications. Nowadays, construction projects are facing various problems where delays are considered major one of them, particularly in Egypt. Analyzing construction delay causes while attempting to mitigate their impact is a matter of crucial importance. That's why a program was developed to help the user assess the delay causes' impact with respect to the project's concerned activities. Besides, it was designed to identify the potential mitigation measures according to the delay cause type. The Building Information Modeling (BIM) was the platform used to carry out such analysis. Thus, the main objective of this study is to investigate the delay causes' effect on the project's duration and cost. This was achieved by analyzing the concerned activities' affected duration and cost, according to the selected delay cause and its associated mitigation measures, by means of a developed user plug-in. Then, duration/cost summary tables were presented for the user to highlight the main findings in terms of delay and saving impact. The attained results were considered important indicators to be referred to for similar cases throughout the project progress. Apart from being a helpful tool for assessing construction delay causes' impact, this developed user plug-in could also serve in future research works associated to this subject. (C) 2021 THE AUTHORS. Published by Elsevier BV on behalf of Faculty of Engineering, Ain Shams University.
引用
收藏
页码:3553 / 3568
页数:16
相关论文
共 50 条
  • [1] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [2] Exploring delay causes of road construction projects in Egypt
    Aziz, Remon F.
    Abdel-Hakam, Asmaa A.
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (02) : 1515 - 1539
  • [3] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    [J]. PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [4] Causes of delay in construction projects in Oman
    Umar, Tariq
    [J]. MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [5] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310
  • [6] A Study on Causes of Delay in Road Construction Projects across 25 Developing Countries
    Rivera, Ludwig
    Baguec, Hilario, Jr.
    Yeom, Chunho
    [J]. INFRASTRUCTURES, 2020, 5 (10) : 1 - 16
  • [7] Causes of Delay in the Construction Projects of Subway Tunnel
    Zhang, Dingbang
    Zhang, Hang
    Cheng, Tao
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [8] Analyzing delay causes in Egyptian construction projects
    Marzouk, Mohamed M.
    El-Rasas, Tarek I.
    [J]. JOURNAL OF ADVANCED RESEARCH, 2014, 5 (01) : 49 - 55
  • [9] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [10] Causes of Delay in Road Construction Projects in Afghanistan
    Kivrak, Serkan
    Baha, Mohammad Yonis
    [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2024, 83 (01): : 46 - 57