The preparations, course and results of the system test in which a hydroelectric power plant was used to start-up a thermal unit in a baseload power plant

被引:0
|
作者
Kaczmarek, Marcin [1 ]
Kurzynski, Adam [1 ]
Surlej, Marcin [1 ]
Brzozowski, Michal [2 ,3 ]
机构
[1] Energopomiar Elekt Sp Zoo, Ul Swietokrzyska 2, PL-44101 Gliwice, Poland
[2] PSE SA, Konstancin Jeziorna, Poland
[3] Polskie Sieci Elektroenergetyczne SA, Ul Warszawska 165, PL-05520 Konstancin Jeziorna, Poland
来源
PRZEGLAD ELEKTROTECHNICZNY | 2019年 / 95卷 / 02期
关键词
catastrophic failures (blackout); the power plant self-start; restoration of the national power system; island operation;
D O I
10.15199/48.2019.02.03
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The article presents the preparations, course and results of the system test in which a hydroelectric power plant was used to start-up a thermal unit in a baseload power plant. The scope of the test included self-start of the selected generating units in de-energized state, applying their voltage to a separate, voltage-free start-up circuit, start-up of the selected thermal unit, its synchronization and operation in an island grid with the self-starting power plant and synchronization of the island grid with the NPS in a grid substation.
引用
收藏
页码:11 / 18
页数:8
相关论文
共 50 条
  • [21] Modeling and investigation start-up procedures of a combined cycle power plant
    Alobaid, Falah
    Postler, Ralf
    Stroehle, Jochen
    Epple, Bernd
    Kim Hyun-Gee
    APPLIED ENERGY, 2008, 85 (12) : 1173 - 1189
  • [22] Adaptive-edge search for power plant start-up scheduling
    Kamiya, A
    Kawai, K
    Ono, I
    Kobayashi, S
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 1999, 29 (04): : 518 - 530
  • [23] ERECTION AND START-UP OF FIRST UNIT OF GREIFSWALD NUCLEAR-POWER PLANT BRUNO-LEUSCHNER
    RAMBUSCH, K
    STREHOBE.W
    KERNENERGIE, 1974, 17 (07): : 222 - 230
  • [24] Self-start, voltage and start-up power application from Dychow hydro-electric power plant to Dolna Odra power plant-system control tests
    Grzadzielski, Ireneusz
    Sroka, Krzysztof
    Marszalkiewicz, Krzysztof
    PRZEGLAD ELEKTROTECHNICZNY, 2012, 88 (9A): : 16 - 21
  • [25] Study on start-up characteristics of passive containment cooling system for underground nuclear power plant
    Li F.
    Zhang S.
    Zhang D.
    Ming Z.
    Li M.
    Yu F.
    Hedongli Gongcheng, 4 (121-124): : 121 - 124
  • [26] Modelling of Wind, Hydroelectric and Thermal Power Plant Coordinated Dispatch in Latvian Power System
    Linkevics, Olegs
    Mahnitko, Anatolijs
    Mjadjuta, Karina
    Balodis, Maris
    2014 55TH INTERNATIONAL SCIENTIFIC CONFERENCE ON POWER AND ELECTRICAL ENGINEERING OF RIGA TECHNICAL UNIVERSITY (RTUCON), 2014, : 167 - 171
  • [27] Optimization of start-up process in combined cycle steam turbine of a power plant
    Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
  • [28] Yadana field start-up delayed again over power plant woes
    不详
    OIL & GAS JOURNAL, 1999, 97 (35) : 42 - 42
  • [29] Dynamic optimization method for start-up scheduling of a combined cycle power plant
    Shirakawa, Masakazu
    Nakamoto, Masashi
    Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
  • [30] Construction and start-up of combined heat and power plant at the Julich sugar factory
    Lorenz, M
    ZUCKERINDUSTRIE, 2005, 130 (08): : 628 - 635