The preparations, course and results of the system test in which a hydroelectric power plant was used to start-up a thermal unit in a baseload power plant

被引:0
|
作者
Kaczmarek, Marcin [1 ]
Kurzynski, Adam [1 ]
Surlej, Marcin [1 ]
Brzozowski, Michal [2 ,3 ]
机构
[1] Energopomiar Elekt Sp Zoo, Ul Swietokrzyska 2, PL-44101 Gliwice, Poland
[2] PSE SA, Konstancin Jeziorna, Poland
[3] Polskie Sieci Elektroenergetyczne SA, Ul Warszawska 165, PL-05520 Konstancin Jeziorna, Poland
来源
PRZEGLAD ELEKTROTECHNICZNY | 2019年 / 95卷 / 02期
关键词
catastrophic failures (blackout); the power plant self-start; restoration of the national power system; island operation;
D O I
10.15199/48.2019.02.03
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The article presents the preparations, course and results of the system test in which a hydroelectric power plant was used to start-up a thermal unit in a baseload power plant. The scope of the test included self-start of the selected generating units in de-energized state, applying their voltage to a separate, voltage-free start-up circuit, start-up of the selected thermal unit, its synchronization and operation in an island grid with the self-starting power plant and synchronization of the island grid with the NPS in a grid substation.
引用
收藏
页码:11 / 18
页数:8
相关论文
共 50 条
  • [31] Modelling and simulation of a coal-fired power plant for start-up optimisation
    Huebel, Moritz
    Meinke, Sebastian
    Andren, Marcus T.
    Wedding, Christoffer
    Nocke, Juergen
    Gierow, Conrad
    Hassel, Egon
    Funkquist, Jonas
    APPLIED ENERGY, 2017, 208 : 319 - 331
  • [32] Start-up, testing and operation of 1000 kW class MCFC power plant
    Ishikawa, T
    Yasue, H
    JOURNAL OF POWER SOURCES, 2000, 86 (1-2) : 145 - 150
  • [33] Start-Up Optimisation of a Combined Cycle Power Plant with Multiobjective Evolutionary Algorithms
    Bertini, Ilaria
    De Felice, Matteo
    Moretti, Fabio
    Pizzuti, Stefano
    APPLICATIONS OF EVOLUTIONARY COMPUTATION, PT II, PROCEEDINGS, 2010, 6025 : 151 - 160
  • [34] Improving Accuracy and Efficiency of Start-Up Cost Formulations in MIP Unit Commitment by Modeling Power Plant Temperatures
    Silbernagl, Matthias
    Huber, Matthias
    Brandenberg, Rene
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (04) : 2578 - 2586
  • [35] PHYSICAL START-UP OF REACTOR OF BRUNO LEUSCHNER NUCLEAR-POWER PLANT 1ST UNIT
    LOTH, KH
    KERNENERGIE, 1976, 19 (04): : 107 - 112
  • [36] VVER-1000 REACTOR PLANT - DISTINCTIVE FEATURES OF DESIGN, RESULTS OF START-UP OF 5TH UNIT OF NOVOVORONEZH ATOMIC POWER-PLANT, AND WAYS OF FURTHER IMPROVING THE PLANT
    VIKHOREV, YV
    VOZNESENSKII, VA
    DENISOV, VP
    DUKHOVENSKII, AS
    ISAKOV, NA
    KAMYSHAN, AN
    SEDOV, VK
    SIDORENKO, VA
    STEKOLNIKOV, VV
    SOVIET ATOMIC ENERGY, 1981, 50 (02): : 69 - 75
  • [37] Power plant start-up scheduling: a reinforcement learning approach combined with evolutionary computation
    Kamiya, A
    Kimura, H
    Yamamura, M
    Kobayashi, S
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 1998, 6 (01) : 99 - 115
  • [38] Start-up and operational mode of fossil plant units in an isolated (little) power grid
    Wang, Jiasheng
    Deng, Tongtian
    Ran, Jingchuan
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2008, 32 (21): : 102 - 106
  • [39] COMBINED START-UP, PRESSURE REDUCTION, AND SAFETY VALVES FOR BIG POWER PLANT SETS
    KROST, H
    KUCKELHA.K
    SULLIGA, J
    COMBUSTION, 1971, 43 (03): : 32 - &
  • [40] Analysis and optimization of the start-up process based on Badaling solar power tower plant
    Yang, Y.
    Wang, Z.
    Xu, E.
    Ma, G.
    An, Q.
    INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS, SOLARPACES 2014, 2015, 69 : 1688 - 1695