Power plant start-up scheduling: a reinforcement learning approach combined with evolutionary computation

被引:0
|
作者
Kamiya, A
Kimura, H
Yamamura, M
Kobayashi, S
机构
[1] Toshiba Corp, Minato Ku, Tokyo 1058001, Japan
[2] Tokyo Inst Technol, Midori Ku, Yokohama, Kanagawa 226, Japan
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Power plant start-up scheduling is aimed at minimizing the start-up time while limiting turbine rotor stresses to acceptable values. In order to increase on-line performance of searching an optimal or near-optimal start-up schedule during power plant operation, we propose to integrate neural network-based reinforcement learning with evolutionary computation implemented by means of Genetic Algorithms (GA). GA guides reinforcement learning to learn optimal schedules with respect to a number of representative sets of stress limits prior to the start-up process. During start-up, GA combined with reinforcement learning will search an optimal or near-optimal start-up schedule at a given set of stress limits. This approach significantly reduces the time needed for learning and searching. On a SPARC station 20, experiments show that it can search an optimal or near-optimal schedule within tens of seconds of CPU time, a time range which should be acceptable in power plant operations.
引用
收藏
页码:99 / 115
页数:17
相关论文
共 50 条
  • [1] Start-Up Optimisation of a Combined Cycle Power Plant with Multiobjective Evolutionary Algorithms
    Bertini, Ilaria
    De Felice, Matteo
    Moretti, Fabio
    Pizzuti, Stefano
    [J]. APPLICATIONS OF EVOLUTIONARY COMPUTATION, PT II, PROCEEDINGS, 2010, 6025 : 151 - 160
  • [2] Reward strategies for adaptive start-up scheduling of power plant
    Kamiya, A
    Kobayashi, S
    Kawai, K
    [J]. SMC '97 CONFERENCE PROCEEDINGS - 1997 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: CONFERENCE THEME: COMPUTATIONAL CYBERNETICS AND SIMULATION, 1997, : 3417 - 3424
  • [3] Optimization of the start-up procedure of a combined cycle power plant
    Albanesi, C.
    Bossi, M.
    Magni, L.
    Paderno, J.
    Pretolani, R.
    Kuehl, P.
    Diehl, M.
    [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
  • [4] Adaptive power plant start-up scheduling: Simulation test results
    Kamiya, A
    Kawai, K
    Ono, I
    Kobayashi, S
    [J]. SMCIA/01: PROCEEDINGS OF THE 2001 IEEE MOUNTAIN WORKSHOP ON SOFT COMPUTING IN INDUSTRIAL APPLICATIONS, 2001, : 29 - 34
  • [5] Adaptive-edge search for power plant start-up scheduling
    Kamiya, A
    Kawai, K
    Ono, I
    Kobayashi, S
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 1999, 29 (04): : 518 - 530
  • [6] Modeling and investigation start-up procedures of a combined cycle power plant
    Alobaid, Falah
    Postler, Ralf
    Stroehle, Jochen
    Epple, Bernd
    Kim Hyun-Gee
    [J]. APPLIED ENERGY, 2008, 85 (12) : 1173 - 1189
  • [7] Construction and start-up of combined heat and power plant at the Julich sugar factory
    Lorenz, M
    [J]. ZUCKERINDUSTRIE, 2005, 130 (08): : 628 - 635
  • [8] Theoretical proof of edge search strategy applied to power plant start-up scheduling
    Kamiya, A
    Kawai, K
    Ono, I
    Kobayashi, S
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 2002, 32 (03): : 316 - 331
  • [9] Plant start-up
    不详
    [J]. NUCLEAR PLANT JOURNAL, 1996, 14 (02) : 6 - 6
  • [10] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant
    Yoshida, Yasuhiro
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):