Construction and start-up of combined heat and power plant at the Julich sugar factory

被引:0
|
作者
Lorenz, M [1 ]
机构
[1] Zuckerfabr Julich AG, D-52409 Julich, Germany
来源
ZUCKERINDUSTRIE | 2005年 / 130卷 / 08期
关键词
Julich sugar factory; combined heat and power generation; energy production; boilers; brown coal;
D O I
暂无
中图分类号
TS2 [食品工业];
学科分类号
0832 ;
摘要
With a view to the future, a new combined heat and power plant has been installed at the Julich sugar factory in order to provide a sure supply of steam and electricity for the production facilities. The greatest value was attached to making the generation of energy reliable, supportive of production, environmentally friendly and cost-effective in the long term. The use of brown coal as fuel in a plant of this size also signals the progressive development of this technology in industrial installations. Thanks to determined management and a team of experts, the project was executed in the record time of only 18 months from placing the order to start-up and of 10 months from application for approval to grant of the licence. The entire period of operation of the boiler in the 2004 campaign can be said to have been particularly successful and exceptionally satisfactory. At no point was it necessary to resort to the reserve heavy fuel oil boiler. The whole volume of beets of the 2004 campaign (about 1. 17 mn t) was processed with the steam from the boiler fired with brown coal. The boiler was out of action for only three hours and thus was available for 99.9% of the time. All problems could be resolved in the course of operation. In practice, the expectations for a boiler with travelling grate and fired with solid material, the slow grate movement and heat storage capacity of which make for particularly secure operation, were fulfilled.
引用
收藏
页码:628 / 635
页数:8
相关论文
共 50 条
  • [1] Kale combined heat and power station for the Julich sugar factory
    Kesseler, G
    Lorenz, M
    [J]. BWK, 2005, 57 (09): : 55 - 58
  • [2] START-UP OF KONNERN SUGAR FACTORY
    不详
    [J]. ZUCKERINDUSTRIE, 1993, 118 (10): : 808 - 808
  • [3] Optimization of the start-up procedure of a combined cycle power plant
    Albanesi, C.
    Bossi, M.
    Magni, L.
    Paderno, J.
    Pretolani, R.
    Kuehl, P.
    Diehl, M.
    [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
  • [4] Start-up and trial operation of the wastewater treatment plant at the Povazsky sugar factory, Trencianska Tepla
    Hutnan, M
    Drtil, M
    Valach, J
    Mico, S
    [J]. LISTY CUKROVARNICKE A REPARSKE, 1998, 114 (7-8): : 204 - 210
  • [5] Modeling and investigation start-up procedures of a combined cycle power plant
    Alobaid, Falah
    Postler, Ralf
    Stroehle, Jochen
    Epple, Bernd
    Kim Hyun-Gee
    [J]. APPLIED ENERGY, 2008, 85 (12) : 1173 - 1189
  • [6] Optimization of start-up process in combined cycle steam turbine of a power plant
    [J]. Ding, Y. (dyj1987214@126.com), 1600, Chinese Society for Electrical Engineering (33):
  • [7] Dynamic optimization method for start-up scheduling of a combined cycle power plant
    Shirakawa, Masakazu
    Nakamoto, Masashi
    [J]. Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2002, 68 (672): : 2377 - 2384
  • [8] Start-Up Optimisation of a Combined Cycle Power Plant with Multiobjective Evolutionary Algorithms
    Bertini, Ilaria
    De Felice, Matteo
    Moretti, Fabio
    Pizzuti, Stefano
    [J]. APPLICATIONS OF EVOLUTIONARY COMPUTATION, PT II, PROCEEDINGS, 2010, 6025 : 151 - 160
  • [9] DESIGN, CONSTRUCTION AND START-UP OF A MODERN COKE PLANT
    WILLIAMS, AE
    SMITH, LO
    KOENIG, KA
    BASCIANI, KA
    [J]. IRON AND STEEL ENGINEER, 1983, 60 (05): : 45 - 53
  • [10] Plant start-up
    不详