Exact Algorithms for Robust Quay Crane Scheduling Problems

被引:3
|
作者
Li, Yitian [1 ,2 ]
Zhang, Canrong [1 ,2 ]
机构
[1] Tsinghua Univ, Shenzhen Int Grad Sch, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertain processing time; Robust optimization; Benders decomposition; Column-and-constraint generation; OPTIMIZATION;
D O I
10.1109/IEEM50564.2021.9673051
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The processing time of loading and unloading tasks is usually fluctuating due to uncertain factors at container terminals. However, most research treats it as deterministic. This paper proposes a two-stage robust optimization approach to tackle the uncertainty proactively. Two kinds of cuts are proposed to tighten the searching space. Some techniques are applied to linearize the subproblem. Both Benders decomposition and column-and-constraint generation algorithms are adopted to solve the robust model, with the two algorithms compared analytically and numerically. Based on extensive experiments, we validate the effectiveness of the algorithms and find the situations that are suitable to the robust model.
引用
下载
收藏
页码:1631 / 1635
页数:5
相关论文
共 50 条
  • [31] Quay crane scheduling with draft and trim constraints
    Wu, Lingxiao
    Ma, Weimin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 97 : 38 - 68
  • [32] Next-generation quay crane scheduling
    Abou Kasm, Omar
    Diabat, Ali
    TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2020, 114 : 694 - 715
  • [33] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [34] A Quay Crane Scheduling Model in Container Terminals
    Tang, Qi
    ADVANCES IN SWARM INTELLIGENCE, PT 2, PROCEEDINGS, 2010, 6146 : 283 - 290
  • [35] Heuristics for quay crane scheduling at indented berth
    Chen, Jiang Hang
    Lee, Der-Horng
    Cao, Jin Xin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) : 1005 - 1020
  • [36] Quay Crane Scheduling Problem with the Consideration of Maintenance
    Liu, Ming
    Liang, Bian
    Zheng, Feifeng
    Chu, Chengbin
    Chu, Feng
    2018 IEEE 15TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2018,
  • [37] Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level
    Msakni, Mohamed Kais
    Diabat, Ali
    Rabadi, Ghaith
    Al-Salem, Mohamed
    Kotachi, Mariam
    COMPUTERS & OPERATIONS RESEARCH, 2018, 99 : 218 - 233
  • [38] Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems
    Lalita, T. R.
    Murthy, G. S. R.
    OPSEARCH, 2022, 59 (01) : 413 - 439
  • [39] Compact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problems
    T. R. Lalita
    G. S. R. Murthy
    OPSEARCH, 2022, 59 : 413 - 439
  • [40] Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints
    Alsoufi, Ghazwan
    Yang, Xinan
    Salhi, Abdellah
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) : 372 - 383