Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints

被引:11
|
作者
Alsoufi, Ghazwan [1 ,2 ]
Yang, Xinan [1 ]
Salhi, Abdellah [1 ]
机构
[1] Univ Essex, Dept Math Sci, Colchester, Essex, England
[2] Univ Mosul, Coll Comp Sci & Math, Mosul, Iraq
关键词
Container terminals; quay crane assignment; quay crane scheduling; branch-and-cut; genetic algorithm; BRANCH-AND-CUT; BERTH ALLOCATION; GENETIC ALGORITHM; HEURISTICS;
D O I
10.1057/s41274-017-0226-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Integrated models of the quay crane assignment problem (QCAP) and the quay crane scheduling problem (QCSP) exist. However, they have shortcomings in that some do not allow movement of quay cranes between vessels, others do not take into account precedence relationships between tasks, and yet others do not avoid interference between quay cranes. Here, an integrated and comprehensive optimization model that combines the two distinct QCAP and QCSP problems which deals with the issues raised is put forward. The model is of the mixed-integer programming type with the objective being to minimize the difference between tardiness cost and earliness income based on finishing time and requested departure time for a vessel. Because of the extent of the model and the potential for even small problems to lead to large instances, exact methods can be prohibitive in computational time. For this reason an adapted genetic algorithm (GA) is implemented to cope with this computational burden. Experimental results obtained with branch-and-cut as implemented in CPLEX and GA for small to large-scale problem instances are presented. The paper also includes a review of the relevant literature.
引用
收藏
页码:372 / 383
页数:12
相关论文
共 50 条
  • [1] Quay crane scheduling with non-interference constraints in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (01) : 124 - 135
  • [2] A particle swarm optimization for the quay crane scheduling problem with non-interference constraints
    Zhao, Jiao
    Tang, Lixin
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 270 - 272
  • [3] A fast heuristic for quay crane scheduling with interference constraints
    Christian Bierwirth
    Frank Meisel
    [J]. Journal of Scheduling, 2009, 12 : 345 - 360
  • [4] A fast heuristic for quay crane scheduling with interference constraints
    Bierwirth, Christian
    Meisel, Frank
    [J]. JOURNAL OF SCHEDULING, 2009, 12 (04) : 345 - 360
  • [5] The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 : 230 - 244
  • [6] A genetic algorithm approach for quay crane scheduling with non-interference constraints at Narvik container terminal
    Hakam, M. H.
    Solvang, W. D.
    Hammervoll, T.
    [J]. INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2012, 15 (04) : 269 - 281
  • [7] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [8] An Integrated Quay Crane Assignment and Scheduling Problem
    Diabat, Ali
    Theodorou, Effrosyni
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 : 115 - 123
  • [9] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [10] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412