Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints

被引:11
|
作者
Alsoufi, Ghazwan [1 ,2 ]
Yang, Xinan [1 ]
Salhi, Abdellah [1 ]
机构
[1] Univ Essex, Dept Math Sci, Colchester, Essex, England
[2] Univ Mosul, Coll Comp Sci & Math, Mosul, Iraq
关键词
Container terminals; quay crane assignment; quay crane scheduling; branch-and-cut; genetic algorithm; BRANCH-AND-CUT; BERTH ALLOCATION; GENETIC ALGORITHM; HEURISTICS;
D O I
10.1057/s41274-017-0226-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Integrated models of the quay crane assignment problem (QCAP) and the quay crane scheduling problem (QCSP) exist. However, they have shortcomings in that some do not allow movement of quay cranes between vessels, others do not take into account precedence relationships between tasks, and yet others do not avoid interference between quay cranes. Here, an integrated and comprehensive optimization model that combines the two distinct QCAP and QCSP problems which deals with the issues raised is put forward. The model is of the mixed-integer programming type with the objective being to minimize the difference between tardiness cost and earliness income based on finishing time and requested departure time for a vessel. Because of the extent of the model and the potential for even small problems to lead to large instances, exact methods can be prohibitive in computational time. For this reason an adapted genetic algorithm (GA) is implemented to cope with this computational burden. Experimental results obtained with branch-and-cut as implemented in CPLEX and GA for small to large-scale problem instances are presented. The paper also includes a review of the relevant literature.
引用
收藏
页码:372 / 383
页数:12
相关论文
共 50 条
  • [41] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [42] Quay crane scheduling with time windows constraints for automated container port
    Wei, Minghui
    He, Junliang
    Tan, Caimao
    Yue, Jiantao
    Yu, Hang
    [J]. OCEAN & COASTAL MANAGEMENT, 2023, 231
  • [43] Multi-Objective Optimization of the Quay Crane Assignment and Scheduling Problem: Time and Movement Optimization
    de Oliveira, Jean Phelippe Ramos
    Barbosa, Juan David
    Lamprou, Maria
    [J]. 2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [44] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [45] Berth Allocation and Quay Crane Assignment Under Uncertainties
    Tan, Caimao
    He, Junliang
    Wang, Yuancai
    [J]. TRANSDISCIPLINARY ENGINEERING FOR COMPLEX SOCIO-TECHNICAL SYSTEMS - REAL-LIFE APPLICATIONS, 2020, 12 : 263 - 270
  • [46] A Genetic Algorithm for Berth Allocation and Quay Crane Assignment
    Rodriguez-Molins, Mario
    Barber, Federico
    Sierra, Maria R.
    Puente, Jorge
    Salido, Miguel A.
    [J]. ADVANCES IN ARTIFICIAL INTELLIGENCE - IBERAMIA 2012, 2012, 7637 : 601 - 610
  • [47] A note on: A modified generalized extremal optimization algorithm for the quay crane scheduling problem with interference constraints
    Trunfio, Roberto
    [J]. ENGINEERING OPTIMIZATION, 2015, 47 (06) : 843 - 859
  • [48] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    [J]. SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [49] Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey
    Rodrigues, Filipe
    Agra, Agostinho
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 303 (02) : 501 - 524
  • [50] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148