An Integrated Quay Crane Assignment and Scheduling Problem

被引:91
|
作者
Diabat, Ali [1 ]
Theodorou, Effrosyni [1 ]
机构
[1] Masdar Inst Sci & Technol, Dept Engn Syst & Management, Abu Dhabi, U Arab Emirates
关键词
Quay crane assignment; Quay crane scheduling; Genetic algorithms; Container terminals; Maritime operations; ALGORITHM;
D O I
10.1016/j.cie.2013.12.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As maritime container transport is developing rapidly, the need arises for efficient operations at container terminals. One of the most important determinants of container handling efficiency is the productivity of quay cranes, which are responsible for unloading and loading operations for container vessels. For this reason, the Quay Crane Assignment Problem (QCAP) and the Quay Crane Scheduling Problem (QCSP) have received increasing attention in the literature and the present paper deals with the integration of these interrelated problems. A formulation is developed for the Quay Crane Assignment and Scheduling Problem (QCASP), which accounts for crane positioning conditions and a Genetic Algorithm (GA) is developed to solve the QCASP. Both the model formulation and the solution methodology are presented in detail and computational analysis is conducted in order to evaluate the performance of the proposed GA. The results obtained from the GA are compared with the results from an exact technique, thus providing complete information about the performance of the heuristic in terms of solution quality. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:115 / 123
页数:9
相关论文
共 50 条
  • [1] An integrated quay crane assignment and scheduling problem with several contractors in container terminals
    Safaeian, M.
    Etebari, F.
    Vahdani, B.
    [J]. SCIENTIA IRANICA, 2021, 28 (02) : 1030 - 1048
  • [2] MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem
    Agra, Agostinho
    Oliveira, Maryse
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 138 - 148
  • [3] An Integrated Quay Crane Assignment and Scheduling Problem Using Branch-and-Price
    Msakni, Mohamed Kais
    Al-Salem, Mohammed
    Diabat, Ali
    Rabadi, Ghaith
    Kotachi, Mariam
    [J]. 2016 INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE & COMPUTATIONAL INTELLIGENCE (CSCI), 2016, : 1286 - 1291
  • [4] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [5] Solving for a Quay Crane Scheduling and Assignment Problem by Simulated Annealing
    Tavakkoli-Moghaddam, Reza
    Taheri, Farid
    Bazzazi, Mohammad
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 326 - 333
  • [6] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [7] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Abou Kasm, Omar
    Diabat, Ali
    Cheng, T. C. E.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) : 435 - 461
  • [8] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [9] The integrated berth allocation, quay crane assignment and scheduling problem: mathematical formulations and a case study
    Omar Abou Kasm
    Ali Diabat
    T. C. E. Cheng
    [J]. Annals of Operations Research, 2020, 291 : 435 - 461
  • [10] Integrated berth allocation and quay crane assignment and scheduling problem under the influence of various factors
    Yu, Meng
    Liu, Xuetao
    Ji, Xiaojing
    Ren, Yucong
    Guo, Wenjing
    [J]. IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2024, 6 (04)