The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints

被引:40
|
作者
Al-Dhaheri, Noura [1 ]
Jebali, Aida [1 ]
Diabat, Ali [1 ]
机构
[1] Masdar Inst Sci & Technol, Dept Engn Syst & Management, Abu Dhabi, U Arab Emirates
关键词
Quay crane scheduling; Container terminal; Mixed integer programming; Genetic algorithm; PORT CONTAINER TERMINALS; NON-CROSSING CONSTRAINT; SPATIAL CONSTRAINTS; ALGORITHM; OPTIMIZATION; ASSIGNMENT; OPERATIONS; WINDOWS; BRANCH;
D O I
10.1016/j.cie.2016.01.011
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The continuous growth in worldwide container terminals' traffic resulted in an increasing interest for the Quay Crane Scheduling Problem (QCSP) in research and practice. This problem consists of scheduling the discharge and load operations of the containers of a vessel by a set of quay cranes; the objective is to minimize the completion time in an attempt to increase container terminal throughput. In the literature, most of the proposed studies focus on improving model formulation and solution methods with a trend, in most recent papers, to incorporate more realistic features of the problem. Despite the importance given by practitioners to vessel stability in scheduling discharge and load operations, there is little research that considers this constraint. This paper presents a novel MIP formulation of the QCSP that takes into account vessel stability constraints. Furthermore, the proposed model is very flexible in handling various settings of the QCSP, such as those related to crane traveling time, task preemption and unidirectional quay crane operating mode. In order to tackle problem complexity, a Genetic Algorithm (GA) is proposed. Computational results validate the MIP formulation on small-sized problems and highlight the performance of the proposed GA. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:230 / 244
页数:15
相关论文
共 50 条
  • [1] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412
  • [2] The Influence of the Quay Crane Traveling Time for the Quay Crane Scheduling Problem
    Yang, Kong-hung
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTIST, IMECS 2012, VOL II, 2012, : 1298 - 1301
  • [3] An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    Lim, Andrew
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (01) : 271 - 283
  • [4] A Multi-Vessel Quay Crane Scheduling Problem
    AlAwar, Kalthoom
    Alawani, Mohamed
    Al Jaberi, Shamma
    [J]. 2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [5] Combined quay crane assignment and quay crane scheduling with crane inter-vessel movement and non-interference constraints
    Alsoufi, Ghazwan
    Yang, Xinan
    Salhi, Abdellah
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (03) : 372 - 383
  • [6] The Quay Crane Scheduling Problem with Time Windows
    Meisel, Frank
    [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 619 - 636
  • [7] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [8] Quay crane scheduling with draft and trim constraints
    Wu, Lingxiao
    Ma, Weimin
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 97 : 38 - 68
  • [9] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    [J]. PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [10] Quay crane scheduling with time windows constraints for automated container port
    Wei, Minghui
    He, Junliang
    Tan, Caimao
    Yue, Jiantao
    Yu, Hang
    [J]. OCEAN & COASTAL MANAGEMENT, 2023, 231