Exact Algorithms for Robust Quay Crane Scheduling Problems

被引:3
|
作者
Li, Yitian [1 ,2 ]
Zhang, Canrong [1 ,2 ]
机构
[1] Tsinghua Univ, Shenzhen Int Grad Sch, Logist Engn & Simulat Lab, Shenzhen 518055, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Unidirectional quay crane scheduling; Uncertain processing time; Robust optimization; Benders decomposition; Column-and-constraint generation; OPTIMIZATION;
D O I
10.1109/IEEM50564.2021.9673051
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The processing time of loading and unloading tasks is usually fluctuating due to uncertain factors at container terminals. However, most research treats it as deterministic. This paper proposes a two-stage robust optimization approach to tackle the uncertainty proactively. Two kinds of cuts are proposed to tighten the searching space. Some techniques are applied to linearize the subproblem. Both Benders decomposition and column-and-constraint generation algorithms are adopted to solve the robust model, with the two algorithms compared analytically and numerically. Based on extensive experiments, we validate the effectiveness of the algorithms and find the situations that are suitable to the robust model.
引用
下载
收藏
页码:1631 / 1635
页数:5
相关论文
共 50 条
  • [21] An exact robust approach for the integrate d b erth allocation and quay crane scheduling problem under uncertain arrival times
    Rodrigues, Filipe
    Agra, Agostinho
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 295 (02) : 499 - 516
  • [22] Exact and heuristic algorithms for scheduling problems
    Arthur Kramer
    4OR, 2020, 18 : 123 - 124
  • [23] Exact and heuristic algorithms for scheduling problems
    Kramer, Arthur
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2020, 18 (01): : 123 - 124
  • [24] A Benders decomposition-based framework for solving quay crane scheduling problems
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (02) : 504 - 515
  • [25] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258
  • [26] Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
    Rodrigues, Filipe
    Agra, Agostinho
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (02) : 721 - 748
  • [27] THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK
    Ting, Shang Xiao
    Xin, Cao Jin
    Bin, Jia
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2271 - 2277
  • [28] The Quay Crane Scheduling Problem with Time Windows
    Meisel, Frank
    NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 619 - 636
  • [29] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412
  • [30] A Method of Quay Crane Scheduling For Container Terminals
    Ning Zhao
    Mi Weijian
    Xue Bao
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 824 - 827