BIM pilot project Auenbach viaduct - Innovative design methods in bridge construction

被引:5
|
作者
Hochmuth, Markus [1 ]
Breinig, Werner [2 ]
机构
[1] OBERMEYER Planen Beraten GmbH, Fachbereich BIM Ingn Bau, Hansastr 40, D-80686 Munich, Germany
[2] DEGES Deutsch Einheit Fernstrassenplanungs & Bau, Abt P4 3, Bereich P4, Zimmerstr 54, D-10117 Berlin, Germany
关键词
pilot project; BEP; BIM; BIM execution plan; common data environment; digital construction; 3-D; 4-D; 5-D; bridge; bridge construction;
D O I
10.1002/bate.201600041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Auenbach viaduct was chosen by the German Federal Ministry of Transport and Digital Infrastructure (BMVI) as the first of four pilot projects for the implementation of design and construction processes with the aid of the Building Information Modelling (BIM) method. In the course of the preliminary design phase this project's existing designs were to be subjected to an extended economic feasibility study. The structure leads the Federal Highway B 107 across the Auenbach valley, a service road and several tracks on the Dresden-Werdau railway line. Originally the structure was intended to span the entire valley with a total length of about 273 m. During the overall optimisation of the alignment in position and elevation the structure was separated into two single structures linked by an intermediate embankment. In the frame of the pilot project a coordinated complete model was prepared. The aim was to integrate all the project planning models for engineering structures as well as the models of the specialist planners for traffic facilities, subsoil and environment in accordance with the design status in each case. The results of this service phase were provided to the further BIM processes as an object-based, coordinated 3-D complete model. By means of a model-based time schedule it was then possible to perform a complex analysis of the model data (e.g. quantities, costs, deadlines, collision detection, etc) and carry out optimisations. The objective of the intended continuation of the pilot project is the automated, model-based elaboration of the final design and tender for the structure. With the digitalization of construction the design and implementation process is undergoing a fundamental methodological transformation. From the standpoint of the owner DEGES and the project planner OBERMEYER the effects expected as a result of establishing the BIM method should be investigated, checked and assessed.
引用
收藏
页码:482 / 489
页数:8
相关论文
共 50 条
  • [31] Best practices of Building Information Modelling (BIM) implementation in design phase for construction project
    Kasim, N.
    Abidin, N. A. Zainal
    Zainal, R.
    Sarpin, N.
    Abd Rahim, M. H. I.
    Saikah, M.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [32] A Study on Application of BIM(Building Information Modeling) to Pre-design in Construction Project
    Ham, Nam-Hyuk
    Min, Kyung-Min
    Kim, Ju-Hyung
    Lee, Yoon-Sun
    Kim, Jae-Jun
    THIRD 2008 INTERNATIONAL CONFERENCE ON CONVERGENCE AND HYBRID INFORMATION TECHNOLOGY, VOL 1, PROCEEDINGS, 2008, : 42 - +
  • [33] Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project (Retraction of vol 11, 125, 2014)
    Liu, Wenping
    Guo, Hongling
    Li, Heng
    Li, Yan
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2015, 12
  • [34] Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia
    Ayoub, Essam
    Malek, Charles
    Helmy, Gamal
    STRUCTURAL CONCRETE, 2013, 14 (03) : 250 - 259
  • [35] Analysis of collaborative design and construction collaborative mechanism of cloud bim platform construction project based on green computing technology
    Zheng, Jiang
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 34 (02) : 819 - 829
  • [36] STUDY ON THE APPLICATION OF DEEP LEARNING TECHNOLOGY AND BIM MODEL IN THE QUALITY MANAGEMENT OF BRIDGE DESIGN AND CONSTRUCTION STAGE
    Zhu, Weiqi
    3C TIC, 2023, 12 (02): : 137 - 154
  • [37] Study on the application of deep learning technology and BIM model in the quality management of bridge design and construction stage
    Huang R.
    Zheng H.
    Lei J.
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)
  • [38] Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China
    Hei, Shanggang
    Zhang, Hong
    Luo, Shen
    Zhang, Ruizhe
    Zhou, Chao
    Cong, Meng
    Ye, Hongyu
    SUSTAINABILITY, 2024, 16 (02)
  • [39] Consider integrated plant design and engineering - Innovative methods are vital in new project management
    Mullick, S.
    Dhole, V.
    HYDROCARBON PROCESSING, 2007, 86 (12): : 81 - 85
  • [40] Micropile Bridge Substructure Replacements: Innovative Approaches to Overcoming Unique Design and Construction Challenges through the Design/Build Process
    DiSalvo, Frank
    Mascia, Stephen
    IFCEE 2018: RECENT DEVELOPMENTS IN GEOTECHNICAL ENGINEERING PRACTICE, 2018, (11): : 129 - 141