BIM pilot project Auenbach viaduct - Innovative design methods in bridge construction

被引:5
|
作者
Hochmuth, Markus [1 ]
Breinig, Werner [2 ]
机构
[1] OBERMEYER Planen Beraten GmbH, Fachbereich BIM Ingn Bau, Hansastr 40, D-80686 Munich, Germany
[2] DEGES Deutsch Einheit Fernstrassenplanungs & Bau, Abt P4 3, Bereich P4, Zimmerstr 54, D-10117 Berlin, Germany
关键词
pilot project; BEP; BIM; BIM execution plan; common data environment; digital construction; 3-D; 4-D; 5-D; bridge; bridge construction;
D O I
10.1002/bate.201600041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Auenbach viaduct was chosen by the German Federal Ministry of Transport and Digital Infrastructure (BMVI) as the first of four pilot projects for the implementation of design and construction processes with the aid of the Building Information Modelling (BIM) method. In the course of the preliminary design phase this project's existing designs were to be subjected to an extended economic feasibility study. The structure leads the Federal Highway B 107 across the Auenbach valley, a service road and several tracks on the Dresden-Werdau railway line. Originally the structure was intended to span the entire valley with a total length of about 273 m. During the overall optimisation of the alignment in position and elevation the structure was separated into two single structures linked by an intermediate embankment. In the frame of the pilot project a coordinated complete model was prepared. The aim was to integrate all the project planning models for engineering structures as well as the models of the specialist planners for traffic facilities, subsoil and environment in accordance with the design status in each case. The results of this service phase were provided to the further BIM processes as an object-based, coordinated 3-D complete model. By means of a model-based time schedule it was then possible to perform a complex analysis of the model data (e.g. quantities, costs, deadlines, collision detection, etc) and carry out optimisations. The objective of the intended continuation of the pilot project is the automated, model-based elaboration of the final design and tender for the structure. With the digitalization of construction the design and implementation process is undergoing a fundamental methodological transformation. From the standpoint of the owner DEGES and the project planner OBERMEYER the effects expected as a result of establishing the BIM method should be investigated, checked and assessed.
引用
收藏
页码:482 / 489
页数:8
相关论文
共 50 条
  • [21] Enhancing construction project supply chains and performance evaluation methods: a case study of a bridge construction project
    Pan, Nai-Hsin
    Lin, Yung-Yu
    Pan, Nang-Fei
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (08) : 1094 - 1106
  • [22] Analysis on the design of delivery methods of the construction project
    Wang, Zhuo-Fu
    Wang, Min
    Hong, Wei-Min
    INTERNATIONAL CONFERENCE ON MANAGEMENT INNOVATION, VOLS 1 AND 2, 2007, : 910 - 915
  • [23] Rockfall embankments. Innovative design and construction methods
    Hofmann, Robert
    GEAM-GEOINGEGNERIA AMBIENTALE E MINERARIA-GEAM-GEOENGINEERING ENVIRONMENT AND MINING, 2023, (168): : 5 - 15
  • [24] Exploration of Sustainable Design of Architectural Engineering and Construction Project base on BIM
    Sun, Kaike
    Shang, Zhongfeng
    Li, Shoucai
    Yang, Yong
    Guo, Shuai
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION SCIENCES, MACHINERY, MATERIALS AND ENERGY (ICISMME 2015), 2015, 126 : 1039 - 1042
  • [25] Lean-BIM Approach for Improving the Performance of a Construction Project in the Design Phase
    EL Mounla, Karim
    Beladjine, Djaoued
    Beddiar, Karim
    Mazari, Belahcene
    BUILDINGS, 2023, 13 (03)
  • [26] Eco-Innovative Construction: Integrating Green Roofs Design within the BIM Framework
    Cascone, Stefano
    SUSTAINABILITY, 2024, 16 (05)
  • [27] Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project
    Lin, Yu-Cheng
    Jung, Shuh
    Su, Yu-Chih
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [28] DESIGN AND CONSTRUCTION OF A PILOT STEAMDRIVE PROJECT IN A REMOTE DESERT ENVIRONMENT.
    Halnes, Michael R.
    SPE Production Engineering, 1988, 3 (02): : 245 - 248
  • [29] Some recent innovative methods and techniques in the design and construction of RCC dams
    Forbes, BA
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 49 - 60
  • [30] The role of construction methods on the conceptual design of a segmental prestressed RC bridge
    Arici, M
    Granata, MF
    Bullo, S
    Di Marco, R
    RECENT DEVELOPMENTS IN BRIDGE ENGINEERING, 2003, : 223 - 232