BIM pilot project Auenbach viaduct - Innovative design methods in bridge construction

被引:5
|
作者
Hochmuth, Markus [1 ]
Breinig, Werner [2 ]
机构
[1] OBERMEYER Planen Beraten GmbH, Fachbereich BIM Ingn Bau, Hansastr 40, D-80686 Munich, Germany
[2] DEGES Deutsch Einheit Fernstrassenplanungs & Bau, Abt P4 3, Bereich P4, Zimmerstr 54, D-10117 Berlin, Germany
关键词
pilot project; BEP; BIM; BIM execution plan; common data environment; digital construction; 3-D; 4-D; 5-D; bridge; bridge construction;
D O I
10.1002/bate.201600041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Auenbach viaduct was chosen by the German Federal Ministry of Transport and Digital Infrastructure (BMVI) as the first of four pilot projects for the implementation of design and construction processes with the aid of the Building Information Modelling (BIM) method. In the course of the preliminary design phase this project's existing designs were to be subjected to an extended economic feasibility study. The structure leads the Federal Highway B 107 across the Auenbach valley, a service road and several tracks on the Dresden-Werdau railway line. Originally the structure was intended to span the entire valley with a total length of about 273 m. During the overall optimisation of the alignment in position and elevation the structure was separated into two single structures linked by an intermediate embankment. In the frame of the pilot project a coordinated complete model was prepared. The aim was to integrate all the project planning models for engineering structures as well as the models of the specialist planners for traffic facilities, subsoil and environment in accordance with the design status in each case. The results of this service phase were provided to the further BIM processes as an object-based, coordinated 3-D complete model. By means of a model-based time schedule it was then possible to perform a complex analysis of the model data (e.g. quantities, costs, deadlines, collision detection, etc) and carry out optimisations. The objective of the intended continuation of the pilot project is the automated, model-based elaboration of the final design and tender for the structure. With the digitalization of construction the design and implementation process is undergoing a fundamental methodological transformation. From the standpoint of the owner DEGES and the project planner OBERMEYER the effects expected as a result of establishing the BIM method should be investigated, checked and assessed.
引用
收藏
页码:482 / 489
页数:8
相关论文
共 50 条
  • [41] Basic research in support of innovative fuels design for the GEn IV systems: The F-BRIDGE project
    Valot, Carole
    Bertolus, Marjorie
    Konings, Rudy
    Somers, Joe
    de Groot, Sander
    NUCLEAR ENGINEERING AND DESIGN, 2011, 241 (09) : 3521 - 3529
  • [42] Precast concrete design-construction of San Mateo-Hayward Bridge widening project
    Asnaashari, A
    Grafton, RJ
    Johnnie, M
    PCI JOURNAL, 2005, 50 (01): : 26 - +
  • [43] The EXPO-roof in Hanover as a pilot project in timber construction, development and application of non-ruled construction methods
    Natterer, Julius
    Burger, Norbert
    Muller, Alan
    Natterer, Johannes
    Bautechnik, 2001, 78 (10) : 693 - 705
  • [44] BIM as the New Sustainable Design-Construction Manager: Case Study of ALN Building Project Experience
    Pasha, Petrit
    Rasdi, Mohd Tajuddin Mohd
    Utaberta, Nangkula
    Yan, Xin
    Zhou, Yijiao
    ADVANCES IN CIVIL ENGINEERING MATERIALS, 2023, 310 : 125 - 138
  • [45] Edgar Cardoso's bridge at Quiamafulo, Angola. Design and construction in the late 1950's of the third road viaduct across the River Cuanza
    de Saldanha, Jose Luis Possolo
    CONSTRUCTION HISTORY-INTERNATIONAL JOURNAL OF THE CONSTRUCTION HISTORY SOCIETY, 2023, 38 (01): : 49 - 71
  • [46] Highway bridge seismic design: Summary of FHWA/MCEER project on seismic vulnerability of new highway construction
    Friedland I.M.
    Buckle I.G.
    Lee G.C.
    Earthquake Engineering and Engineering Vibration, 2002, 1 (1) : 10 - 19
  • [47] Highway bridge seismic design:summary of FHWA/MCEER project on seismic vulnerability of new highway construction
    Ian M.Friedland
    Ian G.Buckle
    George C.Lee
    Earthquake Engineering and Engineering Vibration, 2002, 1 (01) : 10 - 19
  • [48] Innovative Design and Construction Process for a Self-Anchored Suspension and Cable-Stayed Cooperation Bridge in China
    Wang, Xiaoming
    Wang, Chengshu
    Zhang, Minfang
    Xu, Yuanxiao
    Lei, Xiaoming
    STRUCTURAL ENGINEERING INTERNATIONAL, 2018, 28 (02) : 178 - 184
  • [49] APPLICATION OF BIM TECHNOLOGY IN DESIGN AND CONSTRUCTION: A CASE STUDY OF PHARMACEUTICAL INDUSTRIAL BASE OF AMINO ACID BUILDING PROJECT
    Doumbouya, Lancine
    Guan, Chang Sheng
    Gao, Guoping
    Pan, Yangshao
    16TH INTERNATIONAL SCIENTIFIC CONFERENCE: ENGINEERING FOR RURAL DEVELOPMENT, 2017, : 1495 - 1502
  • [50] RETRACTED: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project (Retracted article. See vol. 12, 96, 2015)
    Liu, Wenping
    Guo, Hongling
    Li, Heng
    Li, Yan
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2014, 11