Micropile Bridge Substructure Replacements: Innovative Approaches to Overcoming Unique Design and Construction Challenges through the Design/Build Process

被引:0
|
作者
DiSalvo, Frank [1 ]
Mascia, Stephen [2 ]
机构
[1] Moretrench Amer Corp, 100 Stickle Ave, Rockaway, NJ 07866 USA
[2] ECCO III Enterprises, 201 Saw Mill River Rd, Yonkers, NY 10701 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Replacement foundation installations for three of the six bridge locations along the Saw Mill River Parkway included under a New York State Department of Transportation (NYSDOT) design/build contract presented significant challenges for the project team. At two of the locations, the existing columns supporting the traffic deck were founded in the middle of a river directly beneath historic stone arched bridges carrying local traffic. During a storm event, tree limbs and other debris would catch against the columns, forming dam structures sufficient to cause local community flooding. Micropiles were selected to replace the river bearing columns and abutments and also to provide lateral restraint for support of the above roadway and embankment. Design and installation of the micropiles at these locations demanded an innovative approach to technical challenges. This paper will discuss the solutions to the challenges presented at all three locations, the technical success of which was a direct result of close collaboration and cooperation by all members of the design/build team throughout the work.
引用
收藏
页码:129 / 141
页数:13
相关论文
共 3 条
  • [1] Industrial bridge building- An effective bridge construction process through an integrated design and construction process
    Ekstrom, Daniel
    Rempling, Rasmus
    Plos, Mario
    [J]. NORDIC CONCRETE RESEARCH, 2014, 50 (02): : 79 - 82
  • [2] Maine builds longest-span precast segmental bridge with unique design-build selection process
    Phipps, AR
    [J]. FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A71 - A75
  • [3] Innovative Design and Construction Process for a Self-Anchored Suspension and Cable-Stayed Cooperation Bridge in China
    Wang, Xiaoming
    Wang, Chengshu
    Zhang, Minfang
    Xu, Yuanxiao
    Lei, Xiaoming