A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling

被引:33
|
作者
Naderi, B. [2 ]
Zandieh, M. [1 ]
Ghomi, S. M. T. Fatemi [2 ]
机构
[1] Shaheed Beheshti Univ, Dept Ind Management Management & Accounting, Tehran, Iran
[2] Amir Kabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Scheduling; Flexible flow line; Sequence dependent setup time; Preventive maintenance; Variable neighborhood search; SINGLE-MACHINE; 2-MACHINE FLOWSHOP; AVAILABILITY CONSTRAINTS; SHOP; ALGORITHM; TARDINESS; MAKESPAN; SEARCH; JOBS;
D O I
10.1007/s10845-008-0157-6
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper investigates flexible flow line problems with sequence dependent setup times and different preventive maintenance policies. The optimization criterion is the minimization of makespan. The contribution of this work could be divided into two parts: (1) Since the proposed integrating methods in the literature are often not only complicated but also problem-specific, we have been thinking of providing a technique simple to implement, yet easily extendible to any other machine scheduling problems to overcome the foregoing drawbacks. (2) In order to tackle the problem, we propose a novel variable neighborhood search (VNS) as well as the adaptations of some existing high performing metaheuristics in the literature. The proposed VNS uses advanced neighborhood search structures. In order to evaluate the algorithms, a benchmark is established with the meticulous care. All the results illustrate that the VNS outperforms the other algorithms.
引用
下载
收藏
页码:683 / 694
页数:12
相关论文
共 50 条
  • [31] Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    Andres, Carlos
    Miralles, Cristobal
    Pastor, Rafael
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1212 - 1223
  • [32] Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
    Zhang, Zikai
    Tang, Qiuhua
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 159
  • [33] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [34] HEURISTICS IN FLOW-SHOP SCHEDULING WITH SEQUENCE DEPENDENT SETUP TIMES
    SIMONS, JV
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1992, 20 (02): : 215 - 225
  • [35] Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines
    Zhang, Zikai
    Tang, Qiuhua
    Computers and Industrial Engineering, 2021, 159
  • [36] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [37] Parallel Servers Scheduling with Dynamic Sequence-Dependent Setup Time
    Thanh-Cong Dinh
    Bae, Hyerim
    INTELLIGENT DECISION TECHNOLOGIES (IDT'2012), VOL 2, 2012, 16 : 79 - 87
  • [38] A bi-objective optimization for flow shop group scheduling problem with sequence dependent setup time
    Sekkal, Djazia Nadjat
    Belkaid, Faycal
    2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 560 - 566
  • [39] Adaptive Hybrid Algorithms for the Sequence-Dependent Setup Time Permutation Flow Shop Scheduling Problem
    Li, Xiaoping
    Zhang, Yi
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (03) : 578 - 595
  • [40] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378