Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types

被引:33
|
作者
Tran, Dai Q. [1 ]
Diraviam, Guru [1 ]
Minchin, R. Edward, Jr. [2 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, 1530 W 15th St,2150 Learned Hall, Lawrence, KS 66045 USA
[2] Univ Florida, Rinker Sch Construct Management, Construct, 304 Rinker Hall, Gainesville, FL 32611 USA
关键词
Delivery methods; Project types; Performance; Highways;
D O I
10.1061/(ASCE)CO.1943-7862.0001437
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The design-build (D-B) project delivery method has been used increasingly by state departments of transportation (DOTs) because of its documented benefits. Many studies have shown the superior performance of D-B projects when compared to traditional design-bid-build (D-B-B) projects. However, these studies often rely on experts' judgments or small sample sizes based on data collected from surveys, interviews, or case studies. There are few, if any, empirical studies that have compared D-B-B and D-B highway project performance by work types. This research analyzed 139 pairs of D-B-B and D-B highway projects built by the Florida DOT. The 139 pairs of projects were classified into five categories of work types: (1)new construction; (2)reconstruction; (3)resurfacing, restoration, rehabilitation (3R) projects; (4)intelligent transportation systems (ITS)-related projects; and (5)miscellaneous construction such as sidewalks, bike lanes, or landscaping. The study employed both parametric and nonparametric statistical tests to compare cost growth, schedule growth, and construction intensity metrics across the five project work types. The results show that D-B projects statistically perform better than D-B-B in terms of cost growth and schedule growth for miscellaneous construction and 3R project work types, respectively. Design-build projects also statistically provide a higher construction intensity (more work put in place) than D-B-B for new construction and reconstruction work types. No statistically significant differences between D-B-B and D-B projects were found for other project work types. This study contributes to the construction engineering and management body of knowledge by providing empirical comparisons between D-B-B and D-B project performance on the basis of different types of work. The findings from this paper may provide guidance for state DOTs and practitioners to select D-B project delivery for specific work types and benchmarks D-B against D-B-B.
引用
收藏
页数:9
相关论文
共 50 条
  • [1] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [2] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [3] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [4] An Empirical Comparison of Cost Growth between Highway Design-Bid-Build and Design-Build Projects by Project Size
    Tran, Dai
    Lampe, J. Cameron
    Bypaneni, Sai
    Molenaar, Keith
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2029 - 2038
  • [5] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [6] Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods
    Yu, Tao
    Shen, Geoffrey Qiping
    Shi, Qian
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (04)
  • [7] Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis
    Moon, Hyosoo
    Kim, Kwonhyun
    Lee, Hyun-Soo
    Park, Moonseo
    Williams, Trefor P.
    Son, Bosik
    Chun, Jae-Youl
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (09)
  • [8] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [9] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893
  • [10] Performance of performance specifications in design-build highway projects
    Brochner, Jan
    Silfwerbrand, Johan
    CONSTRUCTION ECONOMICS AND BUILDING, 2019, 19 (02): : 111 - 125