Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types

被引:33
|
作者
Tran, Dai Q. [1 ]
Diraviam, Guru [1 ]
Minchin, R. Edward, Jr. [2 ]
机构
[1] Univ Kansas, Dept Civil Environm & Architectural Engn, 1530 W 15th St,2150 Learned Hall, Lawrence, KS 66045 USA
[2] Univ Florida, Rinker Sch Construct Management, Construct, 304 Rinker Hall, Gainesville, FL 32611 USA
关键词
Delivery methods; Project types; Performance; Highways;
D O I
10.1061/(ASCE)CO.1943-7862.0001437
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The design-build (D-B) project delivery method has been used increasingly by state departments of transportation (DOTs) because of its documented benefits. Many studies have shown the superior performance of D-B projects when compared to traditional design-bid-build (D-B-B) projects. However, these studies often rely on experts' judgments or small sample sizes based on data collected from surveys, interviews, or case studies. There are few, if any, empirical studies that have compared D-B-B and D-B highway project performance by work types. This research analyzed 139 pairs of D-B-B and D-B highway projects built by the Florida DOT. The 139 pairs of projects were classified into five categories of work types: (1)new construction; (2)reconstruction; (3)resurfacing, restoration, rehabilitation (3R) projects; (4)intelligent transportation systems (ITS)-related projects; and (5)miscellaneous construction such as sidewalks, bike lanes, or landscaping. The study employed both parametric and nonparametric statistical tests to compare cost growth, schedule growth, and construction intensity metrics across the five project work types. The results show that D-B projects statistically perform better than D-B-B in terms of cost growth and schedule growth for miscellaneous construction and 3R project work types, respectively. Design-build projects also statistically provide a higher construction intensity (more work put in place) than D-B-B for new construction and reconstruction work types. No statistically significant differences between D-B-B and D-B projects were found for other project work types. This study contributes to the construction engineering and management body of knowledge by providing empirical comparisons between D-B-B and D-B project performance on the basis of different types of work. The findings from this paper may provide guidance for state DOTs and practitioners to select D-B project delivery for specific work types and benchmarks D-B against D-B-B.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Precontract Negotiations in Design-Build Projects
    Erkal, Elif Deniz Oguz
    Molenaar, Keith
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 1 - 10
  • [42] Design-build and public works projects
    Constr Specifier, 3 (56):
  • [43] Design-Build: Build-Design
    Foote, Jonathan
    JOURNAL OF ARCHITECTURAL EDUCATION, 2012, 65 (02) : 52 - 58
  • [44] Design-build approach to renovation projects
    Allen, Gregory L.
    HPAC Heating, Piping, Air Conditioning, 1996, 68 (09):
  • [45] Concurrent engineering in design-build projects
    Anumba, Chimay J.
    Evbuomwan, Nosa F.O.
    Construction Management and Economics, 1997, 15 (03): : 271 - 281
  • [46] An Empirical Analysis of Project Performance Outcomes for Best-Value Procurement in Design-Bid-Build Projects
    Lines, Brian C.
    Nguyen, Phuong H. D.
    Kakarapalli, Raghu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (03)
  • [47] BIM Roles and Responsibilities in Developing Countries: A Dedicated Matrix for Design-Bid-Build Projects
    Habib, Um E. Hani
    Nasir, Abdur Rehman
    Ullah, Fahim
    Qayyum, Siddra
    Thaheem, Muhammad Jamaluddin
    BUILDINGS, 2022, 12 (10)
  • [48] Geotechnical considerations for design-build highway contracts
    Schwidder, AJ
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2, 2004, (126): : 1813 - 1822
  • [49] Stakeholder input in design-build highway construction
    Molenaar, KR
    Smith, R
    Sencer, J
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 611 - 620
  • [50] Performance of a design-build project
    Smith, Ross J.
    Jaffe, Rochelle C.
    Forensic Engineering, Proceedings of the Congress, 2007, 217 : 476 - 488