Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods

被引:14
|
作者
Yu, Tao [1 ,2 ]
Shen, Geoffrey Qiping [2 ]
Shi, Qian [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Sch Econ & Management, Tongji Bldg A1707,Zhangwu Rd 1, Shanghai 200092, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Z Block, Kowloon 999077, Hong Kong, Peoples R China
关键词
Design-bid-build; Design-build; Economic theories; Performance quality; Project profits; Quality-profit equilibrium points; Contracting; PRODUCT QUALITY; CANNIBALIZATION; SEGMENTATION; COMPETITION; OBJECTIVES; MARKETS;
D O I
10.1061/(ASCE)CO.1943-7862.0001262
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The choice of delivery method is one of the most important decisions that can determine the quality of construction projects. Two basic delivery methods, design-bid-build and design-build, have been compared in terms of project quality; however, an important quality dimension, performance quality, has generally been ignored in previous studies. In this study, the authors used existing economic theories to develop a model to examine the performance quality and project profits of these two delivery methods. The equilibrium points of the model were analyzed with consideration given to influencing factors such as cost coefficient, cooperation efficiency, and coordination cost. Four propositions were made to facilitate the quality-profit comparisons between design-bid-build and design-build. The first proposition showed that to maximize personal profit, the project coordinator should always keep a balance between design quality and construction quality, regardless of the delivery method. The other three propositions indicated that both methods can generate relatively higher levels of performance quality and project profits in an appropriate project environment. Based on these propositions, the authors ranked the performance quality and profits of the two methods within different conditions and used a real project to exhibit the practical value of these findings. Via case study, cooperation efficiency was identified as the most critical factor that determines the selection of delivery method. In addition, three key steps were summarized to facilitate the application of the model developed in this study. (C) 2016 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [2] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [3] Characteristics of Procurement Methods in Malaysia - Comparing Design-Bid-Build, Design-Build and Construction Management
    Suratkon, Azeanita
    Yunus, Riduan
    Deraman, Rafikullah
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (03): : 1 - 11
  • [4] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [5] Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
    Tran, Dai Q.
    Diraviam, Guru
    Minchin, R. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [6] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [7] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893
  • [8] Comparing Project Performance of Design-Build and Design-Bid-Build Methods for Large-sized Public Apartment Housing Projects in Korea
    Park, Hye-Sung
    Lee, Donghoon
    Kim, Sunkuk
    Kim, Jin-Lee
    [J]. JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2015, 14 (02) : 323 - 330
  • [9] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [10] Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis
    Moon, Hyosoo
    Kim, Kwonhyun
    Lee, Hyun-Soo
    Park, Moonseo
    Williams, Trefor P.
    Son, Bosik
    Chun, Jae-Youl
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (09)