Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis

被引:11
|
作者
Moon, Hyosoo [1 ]
Kim, Kwonhyun [2 ]
Lee, Hyun-Soo [3 ]
Park, Moonseo [3 ]
Williams, Trefor P. [4 ]
Son, Bosik [5 ]
Chun, Jae-Youl [6 ]
机构
[1] Seoul Natl Univ, Dept Architecture & Architectural Engn, Seoul 08826, South Korea
[2] Duksung Womens Univ, Dept Psychol, Seoul 01369, South Korea
[3] Seoul Natl Univ, Dept Architecture & Architectural Engn, Inst Construct & Environm Engn, Seoul 08826, South Korea
[4] Rutgers State Univ, Dept Civil & Environm Engn, 96 Frelinghuysen Rd, Piscataway, NJ 08854 USA
[5] Namseoul Univ, Dept Architectural Engn, Chungnam 31020, South Korea
[6] Dankook Univ, Dept Architectural Engn, Chungnam 31116, South Korea
关键词
MAXIMUM-LIKELIHOOD-ESTIMATION; CONTRACTS;
D O I
10.1061/(ASCE)CO.1943-7862.0001873
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study analyzes the cost performance of design-build (DB) and design-bid-build (DBB) delivery systems to examine whether one project delivery system (PDS) is always superior to the other when it presents lower cost growth. Previous studies have not yet separated the effects of PDS and third factors on cost performance and have thus been unable to determine the most significant factor affecting cost performance in the comparison of DB and DBB. Bidding characteristics tend to increase project costs during the construction phase and have been recognized as the third factors associated with the PDS and cost performance. The current study employed a causal relationship model, using path analysis to distinguish the effect of the PDS and bidding characteristics on cost performance, to identify the third factors as mediators and to determine whether the mediation effect of bidding characteristics has a statistically significant effect on cost growth. Subsequently, it applied a t-test to compare the cost performance of DB and DBB delivery systems across project types, based on 197 public projects in Seoul, South Korea. The results show that the cost performance of DBB has a mediation effect on architectural building projects but not civil infrastructure projects. It indicates a condition wherein DB should not be considered superior to DBB despite the lower cost growth. Thus, PDS have the potential to be misjudged when their cost-effectiveness is mediated by bidding characteristics. This study contributes to the construction engineering and (management body of knowledge by providing a causal relationship analysis to compare DB and DBB cost performance based on a mediation effect. The findings from the study may guide practitioners in the architecture, engineering, and construction (AEC) industry to evaluate and select the appropriate PDS for specific project types and provide a method to benchmark DB against DBB. (C) 2020 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [2] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [3] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [4] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [5] Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
    Tran, Dai Q.
    Diraviam, Guru
    Minchin, R. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [6] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [7] An Empirical Comparison of Cost Growth between Highway Design-Bid-Build and Design-Build Projects by Project Size
    Tran, Dai
    Lampe, J. Cameron
    Bypaneni, Sai
    Molenaar, Keith
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2029 - 2038
  • [8] Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods
    Yu, Tao
    Shen, Geoffrey Qiping
    Shi, Qian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (04)
  • [9] Impact of Design Cost on Project Performance of Design-Bid-Build Road Projects
    Shrestha, Pramen P.
    Mani, Nirajan
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [10] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893