Predicting performance of design-build and design-bid-build projects

被引:147
|
作者
Ling, FYY [1 ]
Chan, SL [1 ]
Chong, E [1 ]
Ee, LP [1 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
关键词
performance evaluation; design/build; project management; models;
D O I
10.1061/(ASCE)0733-9364(2004)130:1(75)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build (DB) and design-bid-build (DBB) are two principal project delivery systems used in many countries. This paper reports on models constructed to predict performance of DB and DBB projects on 11 areas, using project-specific data collected from 87 building projects. The study included collecting, checking, and validating industry data, and the statistical development of multivariate linear regression models for predicting project performance. Robust models are developed to predict construction and delivery speeds of DB and DBB projects. Gross floor area of the project is the most significant factor affecting speed. Besides this, for DBB projects, contractors' design ability, and adequacy of plant and equipment would ensure speedy completion of the projects. For DB projects, if the contract period is allowed to vary during tender evaluation, this would slow down the project. Robust models to predict turnover and system quality of DB projects are also constructed. A DB contractor's track record is an important variable. They must have completed past projects to acceptable quality and have ability in financial, health and safety management.
引用
收藏
页码:75 / 83
页数:9
相关论文
共 50 条
  • [1] Performance of Design-Build and Design-Bid-Build Projects for Public Universities
    Shrestha, Pramen P.
    Fernane, James D.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [2] Performance of Highway Design-Bid-Build and Design-Build Projects by Work Types
    Tran, Dai Q.
    Diraviam, Guru
    Minchin, R. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (02)
  • [3] Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
    Shrestha, Pramen P.
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (01) : 1 - 13
  • [4] Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects
    Lu, Wenxue
    Hua, YuanYuan
    Zhang, SuJuan
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (01) : 118 - 132
  • [5] Comparing the Performance Quality of Design-Bid-Build and Design-Build Delivery Methods
    Yu, Tao
    Shen, Geoffrey Qiping
    Shi, Qian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (04)
  • [6] Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis
    Moon, Hyosoo
    Kim, Kwonhyun
    Lee, Hyun-Soo
    Park, Moonseo
    Williams, Trefor P.
    Son, Bosik
    Chun, Jae-Youl
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (09)
  • [7] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)
  • [8] An Empirical Comparison of Cost Growth between Highway Design-Bid-Build and Design-Build Projects by Project Size
    Tran, Dai
    Lampe, J. Cameron
    Bypaneni, Sai
    Molenaar, Keith
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2029 - 2038
  • [9] Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways
    Nguyen, Phuong H. D.
    Tran, Dai Q.
    Bypaneni, Sai P. K.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (11) : 879 - 893
  • [10] Key determinants of performance of design-bid-build projects in Singapore
    Ling, FYY
    [J]. BUILDING RESEARCH AND INFORMATION, 2004, 32 (02): : 128 - 139