Risk-based shutdown management of LNG units

被引:16
|
作者
Keshavarz, Ghaffar [1 ]
Thodi, Premkumar [1 ]
Khan, Faisal [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Shutdown; Redundancy; Standby; Preventive maintenance; Minimum risk; Optimum strategy; SURVEILLANCE REQUIREMENTS; MAINTENANCE; OPTIMIZATION; COMPONENTS; SYSTEMS; COST;
D O I
10.1016/j.jlp.2011.08.006
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Global demand for natural gas may double by 2030, with Liquefied Natural Gas (LNG) growing perhaps fivefold - driven by continued cost reduction. Propane Pre-cooled Mixed Refrigerant (PPMR) of Air Products and Chemicals Inc. (APCI) currently holds 78% of the liquefaction plants on the market. Since the PPMR process has the largest production capacity, its operational reliability needs to be high as any failure may result in catastrophic consequences. Therefore, operational reliability has a key importance in LNG plants. To achieve an acceptable reliability, usually, a constant interval of a preventive maintenance method is used. The limitation of such a method is that the shutdown strategy is not optimum. This study focuses on determining a risk-based shutdown management strategy for APCI plants with capacity of 4.5 million tons per annum. To achieve the minimum risk for the expected life of an LNG plant, a combination of preventive maintenance, active redundancy and standby redundancy is considered. Results of this study reveal that such a combination can significantly reduce the operational risk. This combination (C)improves the plant reliability and maintains it above a minimum operational reliability. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:159 / 165
页数:7
相关论文
共 50 条
  • [1] Risk-based management
    不详
    MATERIALS PERFORMANCE, 1999, 38 (02) : 12 - 12
  • [2] A framework to estimate the risk-based shutdown interval for a processing plant
    Hameed, Abdul
    Khan, Faisal
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2014, 32 : 18 - 29
  • [3] Risk-based optimization of the design of on-shore pipeline shutdown systems
    Medina, Hector
    Arnaldos, Josep
    Casal, Joaquim
    Bonvicini, Sarah
    Cozzani, Valerio
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2012, 25 (03) : 489 - 493
  • [4] RISK-BASED BRIDGE MANAGEMENT
    CESARE, M
    SANTAMARINA, JC
    TURKSTRA, CJ
    VANMARCKE, E
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1993, 119 (05): : 742 - 750
  • [5] A risk-based methodology to estimate shutdown interval considering system availability
    Hameed, Abdul
    Khan, Faisal
    Ahmed, Salim
    PROCESS SAFETY PROGRESS, 2015, 34 (03) : 267 - 279
  • [6] Risk-based Analysis of Pressurized Vessel on LNG Carriers in Harbor
    Nwaoha, Thaddeus Chidiebere
    Adumene, Sidum
    JOURNAL OF ETA MARITIME SCIENCE, 2020, 8 (04) : 242 - 251
  • [7] A RISK-BASED FIRE PROTECTION DESIGN OF A LNG FUELED SHIP
    Kim, Hyunpyo
    Nam, Hyunjoon
    Kang, Ga Hyeong
    Kim, Min Joo
    Kim, Sunghee
    Shin, Dongkyu
    Park, Sung-In
    PROCEEDINGS OF ASME 2023 42ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE & ARCTIC ENGINEERING, OMAE2023, VOL 2, 2023,
  • [8] Risk-based decision making keys LNG terminal siting
    Casada, ML
    OIL & GAS JOURNAL, 2006, 104 (05) : 56 - 60
  • [9] A risk-based approach for the analysis of LNG carriers port operations
    Ovidi, F.
    Landucci, G.
    Picconi, L.
    Chiavistelli, T.
    SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, 2018, : 1655 - 1663
  • [10] Risk-based inspection of refinery units: A practical application
    Choi, SC
    Han, SI
    Jung, HJ
    Kim, JY
    ADVANCES IN FRACTURE AND STRENGTH, PTS 1- 4, 2005, 297-300 : 2687 - 2692