Risk-based shutdown management of LNG units

被引:16
|
作者
Keshavarz, Ghaffar [1 ]
Thodi, Premkumar [1 ]
Khan, Faisal [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Shutdown; Redundancy; Standby; Preventive maintenance; Minimum risk; Optimum strategy; SURVEILLANCE REQUIREMENTS; MAINTENANCE; OPTIMIZATION; COMPONENTS; SYSTEMS; COST;
D O I
10.1016/j.jlp.2011.08.006
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Global demand for natural gas may double by 2030, with Liquefied Natural Gas (LNG) growing perhaps fivefold - driven by continued cost reduction. Propane Pre-cooled Mixed Refrigerant (PPMR) of Air Products and Chemicals Inc. (APCI) currently holds 78% of the liquefaction plants on the market. Since the PPMR process has the largest production capacity, its operational reliability needs to be high as any failure may result in catastrophic consequences. Therefore, operational reliability has a key importance in LNG plants. To achieve an acceptable reliability, usually, a constant interval of a preventive maintenance method is used. The limitation of such a method is that the shutdown strategy is not optimum. This study focuses on determining a risk-based shutdown management strategy for APCI plants with capacity of 4.5 million tons per annum. To achieve the minimum risk for the expected life of an LNG plant, a combination of preventive maintenance, active redundancy and standby redundancy is considered. Results of this study reveal that such a combination can significantly reduce the operational risk. This combination (C)improves the plant reliability and maintains it above a minimum operational reliability. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:159 / 165
页数:7
相关论文
共 50 条
  • [21] Quantitative risk evaluations of LNG equipment applying ASME risk-based maintenance concepts
    Ochiai, S
    Makita, T
    Sanjo, T
    Sato, K
    Katagiri, M
    PROCESS SAFETY PROGRESS, 2005, 24 (03) : 187 - 191
  • [22] Integrating risk-based inspection into risk management plans
    Conley, M
    PROCESS SAFETY PROGRESS, 2005, 24 (04) : 236 - 243
  • [23] The interface challenge in risk-based Asset Management
    da Rocha, T. C. Viana
    Hartmann, A.
    LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 1578 - 1585
  • [24] Wakeup call for risk-based project management
    Pikas, JL
    MATERIALS PERFORMANCE, 1998, 37 (11) : 8 - 8
  • [25] Risk-based approaches to ageing and maintenance management
    Duthie, JC
    Robertson, MI
    Clayton, AM
    Lidbury, DPG
    NUCLEAR ENGINEERING AND DESIGN, 1998, 184 (01) : 27 - 38
  • [26] Menopause management: a cardiovascular risk-based approach
    Haines, C. J.
    Farrell, E.
    CLIMACTERIC, 2010, 13 (04) : 328 - 339
  • [27] Risk-based bridge scour management: A survey
    Pregnolato, M.
    Vardanega, P. J.
    Limongelli, M. P.
    Giordano, P. F.
    Prendergast, L. J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 693 - 701
  • [28] Risk-based acquisition management process and implementation
    Robinson, F
    PROCEEDINGS OF THE JOINT ESA-NASA SPACE-FLIGHT SAFETY CONFERENCE, 2002, 486 : 287 - 290
  • [29] Risk-based approach to plant life management
    Nilsson, F
    NUCLEAR ENGINEERING AND DESIGN, 2003, 221 (1-3) : 293 - 300
  • [30] Risk-based priorities for pesticide management initiatives
    Brown, SL
    Rachman, NJ
    CHEMOSPHERE, 1996, 33 (07) : 1355 - 1368