Risk-based shutdown management of LNG units

被引:16
|
作者
Keshavarz, Ghaffar [1 ]
Thodi, Premkumar [1 ]
Khan, Faisal [1 ]
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Shutdown; Redundancy; Standby; Preventive maintenance; Minimum risk; Optimum strategy; SURVEILLANCE REQUIREMENTS; MAINTENANCE; OPTIMIZATION; COMPONENTS; SYSTEMS; COST;
D O I
10.1016/j.jlp.2011.08.006
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Global demand for natural gas may double by 2030, with Liquefied Natural Gas (LNG) growing perhaps fivefold - driven by continued cost reduction. Propane Pre-cooled Mixed Refrigerant (PPMR) of Air Products and Chemicals Inc. (APCI) currently holds 78% of the liquefaction plants on the market. Since the PPMR process has the largest production capacity, its operational reliability needs to be high as any failure may result in catastrophic consequences. Therefore, operational reliability has a key importance in LNG plants. To achieve an acceptable reliability, usually, a constant interval of a preventive maintenance method is used. The limitation of such a method is that the shutdown strategy is not optimum. This study focuses on determining a risk-based shutdown management strategy for APCI plants with capacity of 4.5 million tons per annum. To achieve the minimum risk for the expected life of an LNG plant, a combination of preventive maintenance, active redundancy and standby redundancy is considered. Results of this study reveal that such a combination can significantly reduce the operational risk. This combination (C)improves the plant reliability and maintains it above a minimum operational reliability. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:159 / 165
页数:7
相关论文
共 50 条
  • [31] Risk-based management of invading plant disease
    Hyatt-Twynam, Samuel R.
    Parnell, Stephen
    Stutt, Richard O. J. H.
    Gottwald, Tim R.
    Gilligan, Christopher A.
    Cunniffe, Nik J.
    NEW PHYTOLOGIST, 2017, 214 (03) : 1317 - 1329
  • [32] Science, science policy, and risk-based management
    Midgley, LP
    ENVIRONMENTAL TOXICOLOGY AND RISK ASSESSMENT: MODELING AND RISK ASSESSMENT (SIXTH VOLUME), 1997, 131 : 286 - 300
  • [33] Supplier Quality Management: A Risk-Based Approach
    Rhoades, Bob
    BIOPHARM INTERNATIONAL, 2010, 23 (01) : 18 - +
  • [34] Risk-based management of solid tumors in children
    Grosfeld, JL
    AMERICAN JOURNAL OF SURGERY, 2000, 180 (05): : 322 - 327
  • [35] A risk-based approach to sensor resource management
    Papageorgiou, Dimitri
    Raykin, Maxim
    ADVANCES IN COOPERATIVE CONTROL AND OPTIMIZATION, 2007, 369 : 129 - +
  • [36] Risk-based approach towards design evaluation and re-assessment of shutdown safety margin
    P. V. Varde
    Tej Singh
    Tanay Mazumdar
    Arihant Jain
    Life Cycle Reliability and Safety Engineering, 2018, 7 (4) : 215 - 234
  • [37] Applicability of risk-based management and the need for risk-based economic decision analysis at hazardous waste contaminated sites
    Khadam, I
    Kaluarachchi, JJ
    ENVIRONMENT INTERNATIONAL, 2003, 29 (04) : 503 - 519
  • [38] LNG RISK MANAGEMENT
    MARTINO, P
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 1980, 14 (12) : 1446 - 1454
  • [39] Optimization of the risk-based small-scale LNG supply chain in the Indonesian archipelago
    Machfudiyanto, Rossy Armyn
    Muslim, Fadhilah
    Humang, Windra Priatna
    Wahjuningsih, Nurul
    Kamil, Insannul
    Ichsan, Mohammad
    Putra, Yanuar Yudha Adi
    HELIYON, 2023, 9 (08)
  • [40] Comparison of risk-based methods for bridge scour management
    Pregnolato, M.
    Giordano, Pier Francesco
    Prendergast, L. J.
    Vardanega, P. J.
    Limongelli, Maria Pina
    SUSTAINABLE AND RESILIENT INFRASTRUCTURE, 2023, 8 (05) : 514 - 531